[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161906":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1161906,822,2,"多选题","以下说法正确的有（ ）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","禁止承包人将工程分包给不具备相应资质条件的单位。",true,{"key":16,"text":17,"correct":14},"B","禁止分包单位将其承包的工程再分包。",{"key":19,"text":20,"correct":14},"C","建设工程主体结构不得分包",{"key":22,"text":23,"correct":24},"D","承包人可以将其承包的全部建设工程转包给第三人",false,{"key":26,"text":27,"correct":24},"E","承包人可以将其承包的全部建设工程肢解以后以分包的名义分别转包给第三人。","ABC","承包人不得将其承包的全部建设工程转包给第三人或将其承包的全部建设工程肢解以后以分包的名义分别转包给第三人。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]