[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161790":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161790,822,1,"单选题","材料采购核算，是以材料采购（ ）为基础，与实际采购成本相比较，核算其成本降低或超耗的程度。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","概算成本",false,{"key":16,"text":17,"correct":14},"B","计划成本",{"key":19,"text":20,"correct":21},"C","预算成本",true,{"key":23,"text":24,"correct":14},"D","统计成本","材料采购核算，是以材料采购预算成本为基础，与实际采购成本相比较，核算其成本降低或超耗的程度。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]