[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161789":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1161789,822,1,"单选题","（ ）是假定先入库的材料先发出，并按该假定的材料实物流转顺序确定发出材料成本和计算结存材料成本的方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","先进先出法",true,{"key":16,"text":17,"correct":18},"B","移动平均法",false,{"key":20,"text":21,"correct":18},"C","加权平均法",{"key":23,"text":24,"correct":18},"D","个别计价法","先进先出法是假定先入库的材料先发出，并按该假定的材料实物流转顺序确定发出材料成本和计算结存材料成本的方法。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]