[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161788":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1161788,822,1,"单选题","结算时建筑企业应审核单价是否符合国家或地方规定的价格，如无规定的，应按（ ）结算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","交易习惯",false,{"key":16,"text":17,"correct":18},"B","合同规定的价格",true,{"key":20,"text":21,"correct":14},"C","实际成本",{"key":23,"text":24,"correct":14},"D","经验价格","结算时建筑企业应审核单价是否符合国家或地方规定的价格，如无规定的，应按合同规定的价格结算。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]