[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161787":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161787,822,1,"单选题","计划成本法下，购买的尚未验收入库材料的实际成本记人“（ ）”科目。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预付账款",false,{"key":16,"text":17,"correct":14},"B","在途物资",{"key":19,"text":20,"correct":21},"C","材料采购",true,{"key":23,"text":24,"correct":14},"D","材料成本差异","计划成本法下，购买的尚未验收入库材料的实际成本记人“材料采购”科目。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]