[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161784":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1161784,822,1,"单选题","计划成本法按期结转材料成本差异，将计划成本调整为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预估成本",false,{"key":16,"text":17,"correct":18},"B","实际成本",true,{"key":20,"text":21,"correct":14},"C","直接成本",{"key":23,"text":24,"correct":14},"D","财务成本","计划成本法按期结转材料成本差异，将计划成本调整为实际成本。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]