[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161740":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161740,822,1,"单选题","工程中经常因为工程质量低劣和不合格而导致不必要的返工或补救，从而导致材料用量出现较大变动，所以要做好（ ）工作。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","编制施工组织设计",false,{"key":16,"text":17,"correct":14},"B","施工图纸会审工作",{"key":19,"text":20,"correct":21},"C","技术交底工作",true,{"key":23,"text":24,"correct":14},"D","施工的预检工作","工程中经常因为工程质量低劣和不合格而导致不必要的返工或补救，从而导致材料用量出现较大变动，所以要做好技术交底工作工作。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]