[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161739":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1161739,822,1,"单选题","现场剩余材料的主要处置措施不包括（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","因建设单位设计变更，造成多余材料的积压，经协商后余料退回建设单位",false,{"key":16,"text":17,"correct":14},"B","工程的剩余物资冲减原项目工程成本",{"key":19,"text":20,"correct":14},"C","竣工后的剩余物资经协商后冲减原项目工程成本",{"key":22,"text":23,"correct":24},"D","工程竣工后废旧物资，由原项目的项目经理负责处理",true,"工程竣工后废旧物资，由公司物资部负责处理。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]