[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161710":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1161710,822,1,"单选题","在采购过程中，既不能不考虑采购费用的节约，也不能不考虑储存费用的节约，应当力求使采购费用与管费用之和（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","与施工保持一致",false,{"key":16,"text":17,"correct":14},"B","最均衡",{"key":19,"text":20,"correct":14},"C","最大",{"key":22,"text":23,"correct":24},"D","最小",true,"应当力求使采购费用与管费用之和最小。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]