[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161681":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161681,822,1,"单选题","材料堆码时，每层、每堆力求成整数，过磅材料分层、分捆计重，做出标记，自下而上累计数量，遵循的是（ ）原则。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","合理",false,{"key":16,"text":17,"correct":14},"B","牢固",{"key":19,"text":20,"correct":21},"C","定量",true,{"key":23,"text":24,"correct":14},"D","整齐","材料堆码时，每层、每堆力求成整数，过磅材料分层、分捆计重，做出标记，自下而上累计数量，遵循的是定量原则。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]