[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161622":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1161622,822,1,"单选题","对机械连接接头的每一验收批，必须在工程结构中随机截取（ ）个试件作单向拉伸试验。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","4",false,{"key":16,"text":17,"correct":18},"B","3",true,{"key":20,"text":21,"correct":14},"C","2",{"key":23,"text":24,"correct":14},"D","1","对机械连接接头的每一验收批，必须在工程结构中随机截取3个试件作单向拉伸试验。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]