[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161621":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1161621,822,1,"单选题","砂浆试件制作后应在（ ）温度环境下停置一昼夜（24h±2h）后对试件进行编号并拆模。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","20±5℃",true,{"key":16,"text":17,"correct":18},"B","20±4℃",false,{"key":20,"text":21,"correct":18},"C","20±3℃",{"key":23,"text":24,"correct":18},"D","20±2℃","砂浆试件制作后应在20±5℃温度环境下停置一昼夜（24h±2h）后对试件进行编号并拆模。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]