[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161606":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161606,822,1,"单选题","采购力量不足、资金缺乏的情况下进行材料采购时，通常采用（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","招标采购",false,{"key":16,"text":17,"correct":14},"B","联合开发",{"key":19,"text":20,"correct":21},"C","与建设单位协作采购",true,{"key":23,"text":24,"correct":14},"D","补偿贸易","采购力量不足、资金缺乏的情况下进行材料采购时，通常采用与建设单位协作采购的方法。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]