[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161570":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161570,822,1,"单选题","以大分包形式分包的工程，分包单位的物资供方评定工作由（ ）负责。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":14},"B","工程部",{"key":19,"text":20,"correct":21},"C","物资部",true,{"key":23,"text":24,"correct":14},"D","总包材料员","以大分包形式分包的工程，分包单位的物资供方评定工作由项目物资部负责。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]