[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161566":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1161566,822,1,"单选题","单位工程施工生产用料计划以及脚手架、模板、施工工具、辅助生产用料计划由（ ）编制。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","制造维修单位",false,{"key":16,"text":17,"correct":14},"B","技术部门",{"key":19,"text":20,"correct":14},"C","企业一级材料部门",{"key":22,"text":23,"correct":24},"D","基层施工组织",true,"单位工程施工生产用料计划以及脚手架、模板、施工工具、辅助生产用料计划由基层施工组织编制。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]