[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161561":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161561,822,1,"单选题","一次性用料计划的时间与季度、月度材料计划（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一定吻合",false,{"key":16,"text":17,"correct":14},"B","必须吻合",{"key":19,"text":20,"correct":21},"C","不一定吻合",true,{"key":23,"text":24,"correct":14},"D","与季度计划吻合，与月度计划不吻合","一次性用料计划的时间与季度、月度材料计划不一定吻合。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]