[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161559":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1161559,822,1,"单选题","材料月度需用计划也称（ ）计划。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","储备",false,{"key":16,"text":17,"correct":18},"B","备料",true,{"key":20,"text":21,"correct":14},"C","滚动",{"key":23,"text":24,"correct":14},"D","分解","月度需用计划也称备料计划，是由项目技术部门依据施工方案和项目月度计划编制的下月备料计划。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]