[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161552":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1161552,822,1,"单选题","（ ）不属于材料申请计划的基本指标。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","材料需用量",false,{"key":16,"text":17,"correct":14},"B","计划期初预计库存量",{"key":19,"text":20,"correct":14},"C","计划期末储备量",{"key":22,"text":23,"correct":24},"D","材料计划采购量",true,"材料计划采购量不属于材料申请计划的基本指标。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]