[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161550":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1161550,822,1,"单选题","为防止工程竣工材料积压，在工程竣工阶段一般是利用库存控制进料，材料实际需用量（ ）于计划需用量。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","略小",true,{"key":16,"text":17,"correct":18},"B","略大",false,{"key":20,"text":21,"correct":18},"C","等",{"key":23,"text":24,"correct":18},"D","远大","为防止工程竣工材料积压，在工程竣工阶段一般是利用库存控制进料，材料实际需用量略小于计划需用量。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]