[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161536":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1161536,822,1,"单选题","材料计划执行情况考核的目的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","节约原材料",false,{"key":16,"text":17,"correct":14},"B","调整计划",{"key":19,"text":20,"correct":14},"C","降低材料价格",{"key":22,"text":23,"correct":24},"D","激励各部门认真实施材料计划",true,"激励各部门认真实施材料计划是材料计划执行情况考核的目的",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]