[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161495":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161495,822,1,"单选题","材料供应量等于材料消耗定额乘以（ ），并考虑库存、合理储备、综合利用等因素平衡确定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","增加额",false,{"key":16,"text":17,"correct":14},"B","减少额",{"key":19,"text":20,"correct":21},"C","工程量",true,{"key":23,"text":24,"correct":14},"D","完成量","材料供应量等于材料消耗定额乘以工程量，并考虑库存、合理储备、综合利用等因素平衡确定。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]