[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161472":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1161472,822,1,"单选题","以下哪项不属于限额领料的确定依据（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","技术节约措施新规定的单方用料量",false,{"key":16,"text":17,"correct":18},"B","项目进度计划",true,{"key":20,"text":21,"correct":14},"C","正确的工程量",{"key":23,"text":24,"correct":14},"D","定额的正确选用","项目进度计划不属于限额领料的确定依据。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]