[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161463":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1161463,822,1,"单选题","周转材料的实物量承包管理的定包数量的确定中，模板用量的确定的定额损耗率一般不超过计划用量的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1％",true,{"key":16,"text":17,"correct":18},"B","2％",false,{"key":20,"text":21,"correct":18},"C","3％",{"key":23,"text":24,"correct":18},"D","4％","模板用量的确定中，定额损耗率一般不超过计划用量的1%。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]