[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161444":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1161444,822,1,"单选题","一般采用按工程进度、工程部位进行材料耗用，也可按配料单或加工单进行计算，求得与当月进度相适应的数量，作为当月的材料耗用量，这是（ ）的耗用方法。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","大堆材料",false,{"key":16,"text":17,"correct":14},"B","主要材料",{"key":19,"text":20,"correct":21},"C","成品及半成品",true,{"key":23,"text":24,"correct":14},"D","工程用料","一般采用按工程进度、工程部位进行材料耗用，也可按配料单或加工单进行计算，求得与当月进度相适应的数量，作为当月的材料耗用量，这是成品及半成品的耗用方法。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)专业管理实务 岗位知识","建筑工程",0]