[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,6,50,1385,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,223,235,246,258,269,278,290,302,310,322,330,342,350,359,371,383,395,407,419,431,443,455,467,479,491,503,513,525,537,549,561,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1160109,1,"单选题","下列关于防水砂浆防水层施工的说法中，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","砂浆防水工程是利用一定配合比的水泥浆和水泥砂浆（称防水砂浆）分层分次施工，相互交替抹压密实的封闭防水整体",true,{"key":24,"text":25,"correct":26},"B","防水砂浆防水层的背水面基层的防水层采用五层做法，迎水面基层的防水层采用四层做法",false,{"key":28,"text":29,"correct":26},"C","防水层每层应连续施工，素灰层与砂浆层可不在同一天施工完毕",{"key":31,"text":32,"correct":26},"D","揉浆是使水泥砂浆素灰相互渗透结合牢固，既保护素灰层又起到防水作用，当揉浆难时，允许加水稀释","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1160110,"砌筑中控制每皮砖和砖缝厚度，以及门窗洞口、过梁、楼板、预埋件等标高位置是在（ ）控制的。",[38,40,42,44],{"key":20,"text":39,"correct":26},"抄平",{"key":24,"text":41,"correct":26},"放线",{"key":28,"text":43,"correct":26},"摆砖",{"key":31,"text":45,"correct":22},"立皮数杆",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1160111,"施工项目成本控制的措施是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"组织措施、技术措施、经济措施",{"key":24,"text":53,"correct":26},"控制人工费用、控制材料费、控制机械费用、控制间接费及其他直接费",{"key":28,"text":55,"correct":26},"组织措施、制度措施、管理措施",{"key":31,"text":57,"correct":26},"管理措施、技术措施、人力措施",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1160112,"施工项目进度控制的措施主要有（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"组织措施、技术措施、合同措施、经济措施、信息管理措施等",{"key":24,"text":65,"correct":26},"管理措施、技术措施、经济措施等",{"key":28,"text":67,"correct":26},"行政措施、技术措施、经济措施等",{"key":31,"text":69,"correct":26},"政策措施、技术措施、经济措施等",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1160113,"（ ）对工程项目中的安全生产负技术领导责任。",[74,76,78,80],{"key":20,"text":75,"correct":26},"项目经理",{"key":24,"text":77,"correct":26},"安全员",{"key":28,"text":79,"correct":22},"工程师",{"key":31,"text":81,"correct":26},"施工员",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1160114,"为不断揭示工程项目实施过程中在生产、技术、管理诸多方面的质量问题，通常采用PDCA循环方法。PDCA分为四个阶段，即计划P（Plan）、执行D（Do）、检查C（Check）和处置A（Action）阶段。其中将实际工作结果与计划内容相对比，通过检查，看是否达到预期效果，找出问题和异常情况，是指（ ）阶段。",[86,88,90,92],{"key":20,"text":87,"correct":26},"计划P（Plan）",{"key":24,"text":89,"correct":26},"执行D（Do）",{"key":28,"text":91,"correct":22},"检查C（Check）",{"key":31,"text":93,"correct":26},"处置A（Action）",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1160115,"下列项目管理类型中，属于项目管理核心的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"业主方的项目管理",{"key":24,"text":101,"correct":26},"设计方的项目管理",{"key":28,"text":103,"correct":26},"施工方的项目管理",{"key":31,"text":105,"correct":26},"供货方的项目管理",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1160116,"组织流水施工时，划分施工段的最根本目的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"由于施工工艺的要求",{"key":24,"text":113,"correct":26},"可增加更多的专业工作队",{"key":28,"text":115,"correct":26},"提供工艺或组织间歇时间",{"key":31,"text":117,"correct":22},"使各专业队在不同施工挂行流水施工",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1160117,"施工成本分析是施工成本管理的主要任务之一，下列关于施工成本分析的表述中正确的是（",[122,124,126,128],{"key":20,"text":123,"correct":26},"施工成本分析的实质是在施工之前对成本进行估算",{"key":24,"text":125,"correct":26},"施工成本分析是指科学地预测成本水平及其发展趋势",{"key":28,"text":127,"correct":26},"施工成本分析是指预测成本控制的薄弱环节",{"key":31,"text":129,"correct":22},",施工成本分析应贯穿于施工成本管理的全过程",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1160118,"以下关于施工项目管理组织形式的表述，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"施工项目管理组织的形式是指在施工项目管理组织中处理管理层次、管理跨度、部门设置和上下级关系的组织结构的类型",{"key":24,"text":137,"correct":26},"施工项目主要的管理组织形式有工作队式、部门控制式、矩阵制式、事业部制式等",{"key":28,"text":139,"correct":22},"部队控制式项目组织是指主要由企业中有关部门抽出管理力量组成施工项目经理部的方式",{"key":31,"text":141,"correct":26},"在施工项目实施过程中，应进行组织协调、沟通和处理好内部及外部的各种关系，排除各种干扰和障碍",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1160119,"对工期缩短给予奖励；对应急赶工给予优厚的赶工费；对拖延工期给予罚款、收赔偿金是进度控制措施中的（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"组织措施",{"key":24,"text":149,"correct":26},"技术措施",{"key":28,"text":151,"correct":22},"经济措施",{"key":31,"text":153,"correct":26},"合同措施",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1160120,"把质量管理各方面的具体要求落实到每个责任主体、每个部门、每个工作岗位，以便使质量工作事事有人管、人人有专责、办事有标准、工作有检查、检查有考核。要将质量责任制与经济利益有机结合，把质量责任作为经济考核的主要内容。这是指施工项目质量控制体系建立中的（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"分层次规划原则",{"key":24,"text":161,"correct":26},"总目标分解原则",{"key":28,"text":163,"correct":22},"质量责任制原则",{"key":31,"text":165,"correct":26},"系统有效性原则",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1160121,"下列性质中，不属于项目经理部的性质的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"法律强制性",{"key":24,"text":173,"correct":26},"相对独立性",{"key":28,"text":175,"correct":26},"综合性",{"key":31,"text":177,"correct":26},"临时性",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1160122,"以下关于施工项目经理部综合性的描述，错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"施工项目经理部是企业所属的经济组织，主要职责是管理施工项目的各种经济活动",{"key":24,"text":185,"correct":26},"施工项目经理部的管理职能是综合的，包括计划、组织、控制、协调、指挥等多方面",{"key":28,"text":187,"correct":26},"施工项目经理部的管理业务是综合的，从横向看包括人、财、物、生产和经营活动，从纵向看包括施工项目寿命周期的主要过程",{"key":31,"text":189,"correct":22},"施工项目经理部受企业多个职能部门的领导",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1160123,"（ ）是指在施工过程中，对影响项目成本的各种因素加强管理，并采取各种有效措施，将施工中实际发生的各种消耗和支出严格控制在成本计划范围内，随时揭示并及时反馈，计算实际成本和计划成本之间的差异并进行分析，消除施工中的损失浪费现象，发现和总结先进经验。",[194,196,198,200],{"key":20,"text":195,"correct":26},"成本预测",{"key":24,"text":197,"correct":26},"成本计划",{"key":28,"text":199,"correct":26},"成本核算",{"key":31,"text":201,"correct":22},"成本控制",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1160124,"在组织流水施工时，划分的流水施工参数中，流水段属于（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"工艺参数",{"key":24,"text":209,"correct":22},"空间参数",{"key":28,"text":211,"correct":26},"时间参数",{"key":31,"text":213,"correct":26},"平面参数",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1160125,"为了取得施工成本管理的理想效果，必须从多方面采取有效措施实施管理，这些措施不包括（ ）。",[218,219,220,221],{"key":20,"text":147,"correct":26},{"key":24,"text":149,"correct":26},{"key":28,"text":151,"correct":26},{"key":31,"text":222,"correct":22},"管理措施",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},1160126,"项目动态控制的准备工作是将已找出的项目目标进行分解，以确定用于目标控制的（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"偏差值",{"key":24,"text":230,"correct":26},"调整值",{"key":28,"text":232,"correct":22},"计划值",{"key":31,"text":234,"correct":26},"实际值",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1160127,"施工单位的（ ）应对建设工程项目现场的安全施工负总责。",[239,241,243,244],{"key":20,"text":240,"correct":22},"项目负责人",{"key":24,"text":242,"correct":26},"技术负责人",{"key":28,"text":77,"correct":26},{"key":31,"text":245,"correct":26},"栋号经理",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1160128,"建设工程项目总进度目标的控制是（ ）项目管理的任务。",[250,252,254,256],{"key":20,"text":251,"correct":26},"施工方",{"key":24,"text":253,"correct":26},"设计方",{"key":28,"text":255,"correct":22},"业主方",{"key":31,"text":257,"correct":26},"供货方",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1160129,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":26},"进度控制",{"key":24,"text":265,"correct":22},"安全控制",{"key":28,"text":267,"correct":26},"质量控制",{"key":31,"text":201,"correct":26},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1160130,"下列措施中，不属于施工项目安全控制的措施的是（ ）。",[273,274,275,276],{"key":20,"text":147,"correct":26},{"key":24,"text":149,"correct":26},{"key":28,"text":222,"correct":22},{"key":31,"text":277,"correct":26},"安全制度措施",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1160131,"当网络图中某一非关键工作的持续时间拖延且大于该工作的总时差TF时，网络计划总工期将（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":26},"拖延δ",{"key":24,"text":285,"correct":22},"拖延δ—TF",{"key":28,"text":287,"correct":26},"拖延TF+δ",{"key":31,"text":289,"correct":26},"拖延TF-δ",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},1160132,"工程项目竣工成本综合分析是以（ ）为成本核算对象进行的。",[294,296,298,300],{"key":20,"text":295,"correct":26},"工程项目",{"key":24,"text":297,"correct":26},"单项工程",{"key":28,"text":299,"correct":22},"单位工程",{"key":31,"text":301,"correct":26},"分部工程",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1160133,"（ ）对合同工程项目的安全生产负领导责任。",[306,307,308,309],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":26},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1160134,"下列选项中，不属于施工项目管理组织的主要形式的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"工作队式",{"key":24,"text":317,"correct":22},"线性结构式",{"key":28,"text":319,"correct":26},"矩阵制式",{"key":31,"text":321,"correct":26},"事业部制式",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1160135,"建立进度控制小组，将进度控制任务落实到个人；建立进度报告制度和进度信息沟通网络是进度控制措施中的（ ）。",[326,327,328,329],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":26},{"key":28,"text":151,"correct":26},{"key":31,"text":153,"correct":26},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1160136,"下列选项中关于施工项目管理的特点说法有误的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":26},"对象是施工项目",{"key":24,"text":337,"correct":22},"主体是建设单位",{"key":28,"text":339,"correct":26},"内容是按阶段变化的",{"key":31,"text":341,"correct":26},"要求强化组织协调工作",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1160137,"认真执行安全生产规章制度，不违章指导，是（ ）的施工安全管理责任。",[346,347,348,349],{"key":20,"text":75,"correct":26},{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":26},{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},1160138,"（ ）是指在项目完成后，对项目成本形成中的各责任者，按项目成本目标责任制的有关规定，将成本的实际指标与计划、定额、预算进行对比和考核，评定项目成本计划的完成情况和各责任者的业绩，并以此给以相应的奖励和处罚。",[354,355,357,358],{"key":20,"text":195,"correct":26},{"key":24,"text":356,"correct":22},"成本考核",{"key":28,"text":199,"correct":26},{"key":31,"text":201,"correct":26},{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1160139,"下列施工项目管理程序的排序正确的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":366,"correct":26},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":28,"text":368,"correct":26},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":31,"text":370,"correct":26},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":31,"analysis":33},1160140,"以下不属于施工项目现场管理内容的是（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":26},"规划及报批施工用地",{"key":24,"text":378,"correct":26},"设计施工现场平面图",{"key":28,"text":380,"correct":26},"建立施工现场管理组织",{"key":31,"text":382,"correct":22},"为项目经理决策提供信息依据",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},1160141,"以下关于施工项目目标控制的表述，错误的是（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":26},"施工项目目标控制问题的要素包括施工项目、控制目标、控制主体、实施计划、实施信息、偏差数据、纠偏措施、纠偏行为",{"key":24,"text":390,"correct":26},"施工项目控制的目的是排除干扰、实现合同目标",{"key":28,"text":392,"correct":26},"施工项目目标控制是实现施工目标的手段",{"key":31,"text":394,"correct":22},"施工项目目标控制包括进度控制、质量控制和成本控制三个方面",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1160142,"质量管理的核心是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":26},"确定质量方针",{"key":24,"text":402,"correct":26},"确定目标",{"key":28,"text":404,"correct":26},"确定职责",{"key":31,"text":406,"correct":22},"建立有效的质量管理体系",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":28,"analysis":33},1160143,"施工成本分析是在（ ）的基础上，对成本的形成过程和影响因素进行分析。",[411,413,415,417],{"key":20,"text":412,"correct":26},"施工成本计划",{"key":24,"text":414,"correct":26},"施工成本预测",{"key":28,"text":416,"correct":22},"施工成本核算",{"key":31,"text":418,"correct":26},"施工成本考核",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},1160144,"下列属于时间参数的是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":26},"施工段数",{"key":24,"text":426,"correct":26},"施工过程数",{"key":28,"text":428,"correct":22},"流水节拍",{"key":31,"text":430,"correct":26},"施工层数",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1160145,"单位工程完工后，（ ）应组织检查、评定，符合验收标准后，向建设单位提交验收申请。",[435,437,439,441],{"key":20,"text":436,"correct":22},"施工单位",{"key":24,"text":438,"correct":26},"设计单位",{"key":28,"text":440,"correct":26},"建设主管部门",{"key":31,"text":442,"correct":26},"质量监督机构",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":28,"analysis":33},1160146,"建设工程项目按施工成本组成编制施工成本计划，是要将施工成本分解为（ ），从而确定相应的分项计划。",[447,449,451,453],{"key":20,"text":448,"correct":26},"直接费、间接费、利润、税金",{"key":24,"text":450,"correct":26},"单位工程施工成本及分部、分项施工成本",{"key":28,"text":452,"correct":22},"人工费、材料费、施工机械使用费、措施费、间接费",{"key":31,"text":454,"correct":26},"建筑工程费和安装工程费",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":28,"analysis":33},1160147,"下列关于施工项目管理组织的形式的说法中，错误的是（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":26},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":462,"correct":26},"事业部式适用于大型经营型企业的工程承包",{"key":28,"text":464,"correct":22},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":31,"text":466,"correct":26},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1160148,"某工程网络计划中，已知工作M的总时差和自由时差分别为7天和4天，监理工程师检查实际进度时，发现该工作的持续时间延长了5天，说明此时工作M的实际进度将其紧后工作的最早开始时间推迟了（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":26},"5天，但不影响总工期",{"key":24,"text":474,"correct":22},"1天，但不影响总工期",{"key":28,"text":476,"correct":26},"5天，并使总工期延长1天",{"key":31,"text":478,"correct":26},"4天，并使总工期延长2天",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1160149,"施工项目经理部的性质可以概括为三个方面，即（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"1综合性；2相对独立性；3临时性",{"key":24,"text":486,"correct":26},"1施工项目经理部是企业所属的经济组织；2施工项目经理部的管理职能是综合的；3施工项目经理部的管理业务是综合的",{"key":28,"text":488,"correct":26},"施工项目经理部同企业存在着行政隶属关系，要绝对服从企业的全面领导；2施工项目经理部是一个施工项目独立利益的代表，存在着独立的利益；3施工项目经理部负责施工项目从开工到竣工的全过程施工生产经营的管理",{"key":31,"text":490,"correct":26},"1施工项目经理部为项目经理决策提供信息依据，执行项目经理的决策意图，向项目经理全面负责；2项目经理部作为项目团队，应具有团队精神，完成企业所赋予的基本任务；3项目经理部是代表企业履行工程承包合同的主体，对项目产品和建设单位负责",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":28,"analysis":33},1160150,"工程项目质量控制系统的控制目标只用于特定的工程项目质量控制，而不是用于建筑企业的质量管理，即（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":26},"目标不同",{"key":24,"text":498,"correct":26},"范围不同",{"key":28,"text":500,"correct":22},"目的不同",{"key":31,"text":502,"correct":26},"对象不同",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},1160151,"质量管理应由（ ）负责，并要求参加项目的全体员工参与并从事质量管理活动，才能有效地实现预期的方针和目标。",[507,508,509,511],{"key":20,"text":75,"correct":22},{"key":24,"text":242,"correct":26},{"key":28,"text":510,"correct":26},"企业负责人",{"key":31,"text":512,"correct":26},"总工",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},1160152,"在网络计划中，自由时差和总时差都是可以利用的机动时间，若计算工期等于计划工期，那么（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"自由时差等于总时差",{"key":24,"text":520,"correct":26},"自由时差大于总时差",{"key":28,"text":522,"correct":26},"自由时差小于总时差",{"key":31,"text":524,"correct":22},"自由时差不超过总时差",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1160153,"（ ）是把施工对象划分成若干施工段，每个施工过程的专业队（组）依次连续地在每个施工段上进行作业，不同的施工过程，按照工程对象的施工工艺要求，先后相继投人施工，使各专业队（组）在不同的空间范围内可以互不干扰地同时进行不同的工作。",[529,531,533,535],{"key":20,"text":530,"correct":26},"平行施工",{"key":24,"text":532,"correct":22},"流水施工",{"key":28,"text":534,"correct":26},"依次施工",{"key":31,"text":536,"correct":26},"重复施工",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1160154,"已知在双代号网络计划中，某工作有四项紧后工作，它们的最迟开始时间分别为第16天、第17天、第19天和第20天。如果该工作的持续时间为6天，则其最迟开始时间为（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"10天",{"key":24,"text":544,"correct":26},"11天",{"key":28,"text":546,"correct":26},"12天",{"key":31,"text":548,"correct":26},"14天",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1160155,"进行有效的成本偏差控制，成本分析是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":26},"中心",{"key":24,"text":556,"correct":26},"重点",{"key":28,"text":558,"correct":26},"核心",{"key":31,"text":560,"correct":22},"关键",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1160156,"以下不属于施工项目质量控制措施的是（ ）。",[565,566,568,570],{"key":20,"text":63,"correct":22},{"key":24,"text":567,"correct":26},"提高管理、施工及操作人员自身素质",{"key":28,"text":569,"correct":26},"建立完善的质量保证体系",{"key":31,"text":571,"correct":26},"加强原材料质量控制",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},1160157,"在建设工程项目中，监理单位与施工单位之间的关系是（ ）关系。",[576,578,580,582],{"key":20,"text":577,"correct":26},"代理与被代理",{"key":24,"text":579,"correct":26},"合同",{"key":28,"text":581,"correct":26},"委托和被委托",{"key":31,"text":583,"correct":22},"监理和被监理",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":24,"analysis":33},1160158,"在双代号时标网络计划中，关键路线是指（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"没有虚工作的线路",{"key":24,"text":591,"correct":22},"关键结点组成的线路",{"key":28,"text":593,"correct":26},"没有波形线的线路",{"key":31,"text":595,"correct":26},"持续时间最长工作所在的线路",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]