[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,5,50,1385,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1160059,1,"单选题","合成高分子防水涂料的涂膜厚度至少为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1mm",false,{"key":24,"text":25,"correct":26},"B","1.5mm",true,{"key":28,"text":29,"correct":22},"C","2mm",{"key":31,"text":32,"correct":22},"D","3mm","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1160060,"合成高分子防水卷材其施工方法不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"热熔法",{"key":24,"text":41,"correct":22},"冷粘法",{"key":28,"text":43,"correct":22},"自粘法",{"key":31,"text":45,"correct":22},"热风焊接法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1160061,"下面楼面工程属于整体面层的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"大理石",{"key":24,"text":53,"correct":22},"马赛克",{"key":28,"text":55,"correct":26},"现浇水磨石",{"key":31,"text":57,"correct":22},"预制水磨石",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1160062,"下列关于基坑支护的表述中，有误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"钢板桩支护具有施工速度快，可重复使用的特点",{"key":24,"text":65,"correct":22},"工程开挖土方时，地下连续墙可用作支护结构，既挡土又挡水，地下连续墙还可同时用作建筑物的承重结构",{"key":28,"text":67,"correct":22},"深层搅拌水泥土桩墙，采用水泥作为固化剂",{"key":31,"text":69,"correct":26},"常用的钢板桩施工机械有自由落锤、气动锤、柴油锤、振动锤，使用较多的是柴油锤",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1160063,"下列关于基坑（槽）开挖的说法错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"浅基坑（槽）开挖，应先进行测量定位，抄平放线，定出开挖长度",{"key":24,"text":77,"correct":22},"根据土质和水文情况．采取在四侧或两侧直立开挖或放坡，以保证施工操作安全",{"key":28,"text":79,"correct":22},"采用机械开挖基坑时，为避免破坏基底土，应在基底标高以上预留15~30cm的土层由人工挖掘修整",{"key":31,"text":81,"correct":26},"在地下水位以下挖土。应在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下200mm",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1160064,"抹灰不需要做护角的地方有（ ）",[86,88,90,92],{"key":20,"text":87,"correct":22},"室内墙阳角",{"key":24,"text":89,"correct":26},"顶棚梁的阳角",{"key":28,"text":91,"correct":22},"室内柱阳角",{"key":31,"text":93,"correct":22},"门洞阳角",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1160065,"钢结构的连接方法不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"绑扎连接",{"key":24,"text":101,"correct":22},"焊接",{"key":28,"text":103,"correct":22},"螺栓连接",{"key":31,"text":105,"correct":22},"铆钉连接",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1160066,"砖墙的灰缝厚度一般为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"6mm",{"key":24,"text":113,"correct":26},"10mm",{"key":28,"text":115,"correct":22},"15mm",{"key":31,"text":117,"correct":22},"20mm",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1160067,"浅埋式基础通常是指埋置深度在（ ）以内的基础类型。",[122,124,126,128],{"key":20,"text":123,"correct":26},"5",{"key":24,"text":125,"correct":22},"6m",{"key":28,"text":127,"correct":22},"7m",{"key":31,"text":129,"correct":22},"8m",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1160068,"跨度1.5m的现浇钢筋混凝土平台板的底模板，拆除时所需的混凝土强度为（ ）。设计要求混凝土立方体抗压强度标准值。",[134,136,138,140],{"key":20,"text":135,"correct":26},"50％",{"key":24,"text":137,"correct":22},"75％",{"key":28,"text":139,"correct":22},"100％",{"key":31,"text":141,"correct":22},"无限制",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1160069,"下列土的工程分类，除（ ）之外，均为岩石。",[146,148,150,152],{"key":20,"text":147,"correct":22},"软石",{"key":24,"text":149,"correct":26},"砂砾坚土",{"key":28,"text":151,"correct":22},"坚石",{"key":31,"text":153,"correct":22},"特坚石",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1160070,"下列（ ）方法不属于砖砌体的砌筑方法。",[158,160,162,164],{"key":20,"text":159,"correct":22},"“三一”砌筑法",{"key":24,"text":161,"correct":22},"挤浆法",{"key":28,"text":163,"correct":26},"三顺一丁法",{"key":31,"text":165,"correct":22},"满口灰法",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1160071,"浇筑竖向结构混凝土前，应先在底部浇筑一层水泥砂浆，对砂浆的要求是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"与混凝土内砂浆成分相同且强度高一级",{"key":24,"text":173,"correct":22},"与混凝土内砂浆成分不同且强度高一级",{"key":28,"text":175,"correct":22},"与混凝土内砂浆成分不同",{"key":31,"text":177,"correct":26},"与混凝土内砂浆成分相同",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1160072,"钢筋连接的接头设置要求，以下错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"宜设在弯矩或剪力较大处",{"key":24,"text":185,"correct":22},"同一纵向受力钢筋在同一根杆件里不宜设置两个接头",{"key":28,"text":187,"correct":22},"同一纵向受力钢筋在同一根杆件里不宜设置两个以上接头",{"key":31,"text":189,"correct":22},"钢筋接头末端至钢筋弯起点的距离不应小于钢筋直径的10倍",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1160073,"下列各项中，关于钢筋安装的基本规定正确的说法是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"钢筋绑扎用的22号钢丝只用于绑扎直径14mm以下的钢筋",{"key":24,"text":197,"correct":22},"基础底板采用双层钢筋网时，在上层钢筋网下面每隔1.5m放置一个钢筋撑脚",{"key":28,"text":199,"correct":22},"基础钢筋绑扎的施工工艺流程为：清理垫层、画线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→绑扎柱墙预留钢筋→绑扎上层钢筋",{"key":31,"text":201,"correct":26},"控制混凝土保护层用的水泥砂浆垫块或塑料卡的厚度，应等于保护层厚度",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1160074,"下列关于基坑（槽）开挖施工工艺的说法中，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"采用机械开挖基坑时，为避免破坏基底土，应在标高以上预留15～50cm的土层由人工挖掘修整",{"key":24,"text":209,"correct":26},"在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下500mm，以利于土方开挖",{"key":28,"text":211,"correct":22},"雨期施工时，基坑（槽）需全段开挖，尽快完成",{"key":31,"text":213,"correct":22},"当基坑挖好后不能立即进行下道工序时，应预留30cm的土不挖，待下道工序开始再挖至设计标高",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1160075,"钢结构吊装时先将钢构件吊离地面（ ）cm左右，使钢构件中心对准安装位置中心。",[218,220,222,224],{"key":20,"text":219,"correct":22},"20",{"key":24,"text":221,"correct":22},"30",{"key":28,"text":223,"correct":22},"40",{"key":31,"text":225,"correct":26},"50",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1160076,"下列关于钢筋混凝土扩展基础施工要点的基本规定，错误的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"混凝土宜分段分层灌注，每层厚度不超过500mm",{"key":24,"text":233,"correct":26},"混凝土自高处倾落时，如高度超过2m，应设料斗、漏斗、串筒、斜槽、溜管，以防止混凝土产生分层离析",{"key":28,"text":235,"correct":22},"各层各段间应相互衔接，每段长2～3m，使逐段逐层呈阶梯形推进",{"key":31,"text":237,"correct":22},"混凝土应连续浇灌，以保证结构良好的整体性",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1160077,"在任何情况下，纵向受压钢筋的搭接长度不应小于（ ）mm。",[242,244,246,248],{"key":20,"text":243,"correct":26},"200",{"key":24,"text":245,"correct":22},"300",{"key":28,"text":247,"correct":22},"400",{"key":31,"text":249,"correct":22},"500",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1160078,"某地新建住宅小区，全部为砖混楼，建筑层数3、6层，部分为砖基础，部分为砌石基础。施工组织设计拟采用现场拌制砂浆，砂浆配合比由当地有资质的试验室出具，现场机械搅拌。根据施工单位进度计划安排，该工程部分基础于5月初施工，部分基础于7月中旬施工。经查，当地的气温条件在7月份，最高气温可达37℃。根据统计资料，雨季主要集中在5、7月，降雨量较大。 大放脚有等高式和间隔式。间隔式大放脚是每砌两皮砖及一皮砖，轮流两边各收进（ ）砖长。",[254,256,258,260],{"key":20,"text":255,"correct":26},"1\u002F4",{"key":24,"text":257,"correct":22},"1\u002F2",{"key":28,"text":259,"correct":22},"3\u002F4",{"key":31,"text":261,"correct":22},"1",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1160079,"对于一般抹灰所用材料的质量要求说法不正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"品种和性能符合设计要求",{"key":24,"text":269,"correct":22},"砂浆配合比符合设计要求",{"key":28,"text":271,"correct":22},"水泥凝结时间及安定性复检合格",{"key":31,"text":273,"correct":26},"抹灰用的石灰膏熟化期不小于10d",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1160080,"下列浅基础类型中，不属于按构造形式分类的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"条形基础",{"key":24,"text":281,"correct":22},"独立基础",{"key":28,"text":283,"correct":22},"筏板基础",{"key":31,"text":285,"correct":26},"砖基础",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1160081,"下列属于热轧光圆钢筋的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"HPB300",{"key":24,"text":293,"correct":22},"HRB335",{"key":28,"text":295,"correct":22},"HRB400",{"key":31,"text":297,"correct":22},"RRB400",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1160082,"根据桩的（ ）进行分类，可分为预制桩和灌注桩两类。",[302,304,306,308],{"key":20,"text":303,"correct":22},"承载性质",{"key":24,"text":305,"correct":22},"使用功能",{"key":28,"text":307,"correct":22},"使用材料",{"key":31,"text":309,"correct":26},"施工方法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1160083,"防水混凝土的结构裂缝宽度不得大于（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"0.1m",{"key":24,"text":317,"correct":22},"0.3mm",{"key":28,"text":319,"correct":26},"0.2mm",{"key":31,"text":321,"correct":22},"0.4mm",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1160084,"饰面板的安装工艺有传统湿作业法（灌浆法）、干挂法和（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"直接粘贴法",{"key":24,"text":329,"correct":22},"螺栓固结法",{"key":28,"text":331,"correct":22},"铜丝绑扎法",{"key":31,"text":333,"correct":22},"混凝土固结法",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1160085,"下列各项中，关于常见模板的种类、特性的基本规定不正确的说法是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"常见模板的种类有组合式模板、工具式模板两大类",{"key":24,"text":341,"correct":22},"爬升模板适用于现浇钢筋混凝土竖向（或倾斜）结构",{"key":28,"text":343,"correct":26},"飞模适用于小开间、小柱网、小进深的钢筋混凝土楼盖施工",{"key":31,"text":345,"correct":22},"组合式模板可事先按设计要求组拼成梁、柱、墙、楼板的大型模板，整体吊装就位，也可采用散支散拆方法",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1160086,"砌筑工程中，每次搭设脚手架的高度为1.2m左右，称为（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"二步架高度",{"key":24,"text":353,"correct":26},"一步架高度",{"key":28,"text":355,"correct":22},"施工高度",{"key":31,"text":357,"correct":22},"最大搭设高度",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1160087,"常用的钢板桩施工机械有自由落锤﹑气动锤﹑柴油锤﹑振动锤，使用较多的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"自由落锤",{"key":24,"text":365,"correct":22},"气动锤",{"key":28,"text":367,"correct":22},"柴油锤",{"key":31,"text":369,"correct":26},"振动锤",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},1160088,"下列按砌筑主体不同分类的砌体工程中，不符合的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"砖砌体工程",{"key":24,"text":377,"correct":22},"砌块砌体工程",{"key":28,"text":379,"correct":22},"石砌体工程",{"key":31,"text":381,"correct":26},"混凝土砌体工程",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1160089,"混凝土浇水养护的时间：对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土，不得少于（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"7d",{"key":24,"text":389,"correct":22},"10d",{"key":28,"text":391,"correct":22},"5d",{"key":31,"text":393,"correct":22},"14d",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1160090,"钢材可堆放在有顶棚的仓库里，不宜露天堆放。必须露天堆放时，时间不应超过（ ）个月。",[398,400,402,404],{"key":20,"text":399,"correct":22},"3",{"key":24,"text":401,"correct":26},"6",{"key":28,"text":403,"correct":22},"12",{"key":31,"text":405,"correct":22},"18",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1160091,"高强度螺栓的连接形式中，（ ）是目前广泛采用的基本连接形式。",[410,412,414,416],{"key":20,"text":411,"correct":26},"摩擦连接",{"key":24,"text":413,"correct":22},"张拉连接",{"key":28,"text":415,"correct":22},"承压连接",{"key":31,"text":417,"correct":22},"抗剪连接",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":28,"analysis":33},1160092,"下列关于砌块砌体施工工艺的基本规定中，正确的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"灰缝厚度宜为10mm",{"key":24,"text":425,"correct":22},"灰缝要求横平竖直，水平灰缝应饱满，竖缝采用挤浆和加浆方法，允许用水冲洗清理灌缝",{"key":28,"text":427,"correct":26},"在墙体底部，在砌第一皮加气砖前，应用实心砖砌筑，其高度宜不小于200mm",{"key":31,"text":429,"correct":22},"与梁的接触处待加气砖砌完14天后采用灰砂砖斜砌顶紧",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1160093,"混凝土在运输时不应产生离析和分层现象，如有离析现象，则必须在浇注混凝土前进行（ ）",[434,436,438,440],{"key":20,"text":435,"correct":22},"加水",{"key":24,"text":437,"correct":26},"二次搅拌",{"key":28,"text":439,"correct":22},"二次配合比设计",{"key":31,"text":441,"correct":22},"振捣",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":28,"analysis":33},1160094,"模板按（ ）分类，可分为固定式模板，装拆式模板，永久性模板等。",[446,448,450,451],{"key":20,"text":447,"correct":22},"结构类型",{"key":24,"text":449,"correct":22},"施工顺序",{"key":28,"text":309,"correct":26},{"key":31,"text":452,"correct":22},"建筑部件",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1160095,"下列关于毛石砌体施工工艺的基本规定中，有误的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":26},"毛石料和粗石料砌体的灰缝厚度不宜大于10mm，细石料砌体的灰缝厚度不宜小于10mm",{"key":24,"text":460,"correct":22},"施工工艺流程为：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定",{"key":28,"text":462,"correct":22},"每日砌筑高度不宜超过1.2m，在转角处及交接处应同时砌筑，如不能同时砌筑时，应留斜槎",{"key":31,"text":464,"correct":22},"毛石挡土墙一般按3～4皮为一个分层高度砌筑，每砌一个分层高度应找平一次",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1160096,"框架结构模板的拆除顺序一般是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":26},"柱→楼板→梁侧板→梁底板",{"key":24,"text":472,"correct":22},"梁侧板→梁底板→楼板→柱",{"key":28,"text":474,"correct":22},"柱→梁侧板→梁底板→楼板",{"key":31,"text":476,"correct":22},"梁底板→梁侧板→楼板→柱",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1160097,"抹灰层中主要起保护墙体和找平作用的（ ）抹灰。",[481,483,485,487],{"key":20,"text":482,"correct":22},"基层",{"key":24,"text":484,"correct":22},"底层",{"key":28,"text":486,"correct":26},"中层",{"key":31,"text":488,"correct":22},"面层",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1160098,"关于混凝土拌合料运输过程说法不正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":26},"搅拌车在行走过程中可转可不转；",{"key":24,"text":496,"correct":22},"运到浇筑地点时应具有设计配合比所规定的坍落度；",{"key":28,"text":498,"correct":22},"应在混凝土初凝前浇人模板并捣实完毕；",{"key":31,"text":500,"correct":22},"保持其均匀性，不离析、不漏浆。",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1160099,"下列关于涂料防水中防水层施工的说法中，正确的是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"湿铺法是在铺第三遍涂料涂刷时，边倒料、边涂刷、便铺贴的操作方法",{"key":24,"text":508,"correct":26},"对于流动性差的涂料，为便于抹压，加快施工进度，可以采用分条间隔施工的方法，条带宽800～1000mm",{"key":28,"text":510,"correct":22},"胎体增强材料混合使用时，一般下层采用玻璃纤维布，上层采用聚酯纤维布",{"key":31,"text":512,"correct":22},"所有收头均应用密封材料压边，压扁宽度不得小于20mm",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},1160100,"泥浆护壁成孔灌注桩施工中有以下步骤：①成孔②清孔③水下浇筑混凝土④埋设护筒⑤测定桩位⑥下钢筋笼⑦制备泥浆。其工艺流程顺序为（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"⑤④⑦①②⑥③",{"key":24,"text":520,"correct":22},"④⑤⑦①②⑥③",{"key":28,"text":522,"correct":26},"⑦④⑤①②⑥③",{"key":31,"text":524,"correct":22},"⑦⑤④①②⑥③",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":28,"analysis":33},1160101,"仅适用于压垂直桩及软土地基的沉桩施工方法（ ）",[529,531,533,535],{"key":20,"text":530,"correct":22},"锤击沉桩法",{"key":24,"text":532,"correct":22},"水冲沉桩法",{"key":28,"text":534,"correct":26},"静力压桩法",{"key":31,"text":536,"correct":22},"振动沉桩法",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1160102,"某现浇混凝土阳台，混凝土强度为C30，悬挑长度为1.5m，当混凝土强度至少达到（ ）时方可拆除底模板。",[541,543,545,547],{"key":20,"text":542,"correct":26},"30N\u002Fmm2",{"key":24,"text":544,"correct":22},"22.5N\u002Fmm2",{"key":28,"text":546,"correct":22},"21N\u002Fmm2",{"key":31,"text":548,"correct":22},"15N\u002Fmm2",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1160103,"下列关于卷材防水施工的说法中，有误的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"铺设防水卷材前应涂刷基层处理剂，基层处理剂应采用与卷材性能配套（相容）的材料，或采用同类涂料的底子油",{"key":24,"text":556,"correct":22},"铺贴高分子防水卷材时，切忌拉伸过紧，以免使卷材长期处在受拉应力状态，易加速卷材老化",{"key":28,"text":558,"correct":22},"施工工艺流程为：找平层施工→防水层施工→保护层施工→质量检查",{"key":31,"text":560,"correct":26},"卷材搭接接缝口应采用宽度不小于20mm的密封材料封严，以确保防水层的整体防水性能",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":28,"analysis":33},1160104,"钢筋弯曲后的外包尺寸和中心线之间存在一个差值，称为（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"弯曲调整值",{"key":24,"text":568,"correct":22},"弯钩增加长度",{"key":28,"text":570,"correct":26},"量度差值",{"key":31,"text":572,"correct":22},"箍筋调整值",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1160105,"属于一般抹灰的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":26},"水泥砂浆粉刷",{"key":24,"text":580,"correct":22},"斩假石",{"key":28,"text":582,"correct":22},"拉毛灰",{"key":31,"text":584,"correct":22},"水刷石",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},1160106,"当屋面坡度大于（ ）或屋面受振动时，卷材应垂直于屋脊铺贴。",[589,591,593,595],{"key":20,"text":590,"correct":22},"3％",{"key":24,"text":592,"correct":22},"9％",{"key":28,"text":594,"correct":22},"12％",{"key":31,"text":596,"correct":26},"15％",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},1160107,"在土方工程施工中，根据土的（ ）将土分为松软土、普通土、坚土、砂砾坚土、软石、次坚石、坚石、特坚石等8类。",[601,603,605,607],{"key":20,"text":602,"correct":22},"物理组成",{"key":24,"text":604,"correct":26},"开挖难易程度",{"key":28,"text":606,"correct":22},"沉积年代",{"key":31,"text":608,"correct":22},"颗粒级配",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":28,"analysis":33},1160108,"钢筋按（ ）进行分类，可分为热轧钢筋、冷拉钢筋、冷拔钢丝和热处理钢筋。",[613,615,617,619],{"key":20,"text":614,"correct":22},"化学成分",{"key":24,"text":616,"correct":22},"钢筋外形",{"key":28,"text":618,"correct":26},"加工方法",{"key":31,"text":620,"correct":22},"结构作用",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]