[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,4,50,1385,[13,34,46,58,70,82,93,105,117,129,141,153,165,177,189,201,213,225,236,248,260,272,284,296,308,320,332,344,356,368,380,391,403,414,426,438,450,462,474,486,498,510,522,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1160009,1,"单选题","房屋建筑施工图中标高的单位是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","米",true,{"key":24,"text":25,"correct":26},"B","厘米",false,{"key":28,"text":29,"correct":26},"C","毫米",{"key":31,"text":32,"correct":26},"D","分米","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1160010,"底层平面图的朝向一般用（ ）图例表达。",[38,40,42,44],{"key":20,"text":39,"correct":26},"详图符号",{"key":24,"text":41,"correct":26},"索引符号",{"key":28,"text":43,"correct":22},"指北针",{"key":31,"text":45,"correct":26},"对称符号",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1160011,"假想用一个水平剖切平面沿底层门窗洞口切开后得到的平面图，称为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"建筑平面图",{"key":24,"text":53,"correct":26},"标准层平面图",{"key":28,"text":55,"correct":26},"施工平面图",{"key":31,"text":57,"correct":22},"底层平面图",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1160012,"建筑施工图按照（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"正投影法",{"key":24,"text":65,"correct":26},"斜投影法",{"key":28,"text":67,"correct":26},"轴测投影法",{"key":31,"text":69,"correct":26},"平行投影法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1160013,"建筑立面图能反映的图示内容是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"楼梯的开间尺寸",{"key":24,"text":77,"correct":22},"建筑物外貌形状",{"key":28,"text":79,"correct":26},"墙体厚度",{"key":31,"text":81,"correct":26},"屋面坡度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1160014,"建筑平面图能反映的图示内容是（ ）。",[86,88,90,91],{"key":20,"text":87,"correct":22},"楼梯的平面位置",{"key":24,"text":89,"correct":26},"建筑轮廓形状",{"key":28,"text":81,"correct":26},{"key":31,"text":92,"correct":26},"楼地面构造",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":28,"analysis":33},1160015,"以下关于标高的表述错误的是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":26},"标高是表示建筑的地面或某一部位的高度",{"key":24,"text":100,"correct":26},"标高分为相对标高和绝对标高两种",{"key":28,"text":102,"correct":22},"我国把青岛市外的黄海海平面作为相对标高的零点",{"key":31,"text":104,"correct":26},"在房屋建筑中，建筑物的高度用标高表示",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1160016,"在三面投影体系中，v和H面的投影图共同遵循的投影关系是（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"长对正",{"key":24,"text":112,"correct":26},"高平齐",{"key":28,"text":114,"correct":26},"宽相等",{"key":31,"text":116,"correct":26},"长高等",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1160017,"建筑施工图中的平面图、立面图、剖面图称为（ ），是最重要、最基本的图样。",[121,123,125,127],{"key":20,"text":122,"correct":22},"基本建筑图",{"key":24,"text":124,"correct":26},"结构布置图",{"key":28,"text":126,"correct":26},"正投影法图",{"key":31,"text":128,"correct":26},"定位放线图",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},1160018,"用以标注建筑物定位轴线之间的距离的尺寸称为（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"轴线尺寸",{"key":24,"text":136,"correct":26},"构造尺寸",{"key":28,"text":138,"correct":26},"实际尺寸",{"key":31,"text":140,"correct":26},"设计尺寸",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1160019,"有关施工图的尺寸标注说法中，错误的选项是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":26},"尺寸由尺寸线、尺寸界线、尺寸起止符号和尺寸数字四部分组成",{"key":24,"text":148,"correct":26},"角度尺寸线以圆弧线表示，圆弧线的圆心应是该角度的顶点",{"key":28,"text":150,"correct":26},"角的两个边作为尺寸界线，起止符号用箭头",{"key":31,"text":152,"correct":22},"角度尺寸数字一律斜向书写",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1160020,"给水、排水施工图；采暖、通风施工图和电气施工图简称为（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":26},"“建施”",{"key":24,"text":160,"correct":26},"“结施”",{"key":28,"text":162,"correct":26},"“电施”",{"key":31,"text":164,"correct":22},"设施",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1160021,"建筑总平面图是（ ）的依据。",[169,171,173,175],{"key":20,"text":170,"correct":26},"施工定位",{"key":24,"text":172,"correct":26},"平整场地",{"key":28,"text":174,"correct":26},"房屋装修",{"key":31,"text":176,"correct":22},"种植绿化",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1160022,"我国把青岛市外的黄海海平面作为零点所测定的高度尺寸称为（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"绝对标高",{"key":24,"text":184,"correct":26},"相对标高",{"key":28,"text":186,"correct":26},"建筑标高",{"key":31,"text":188,"correct":26},"结构标高",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},1160023,"有关建筑施工图识读顺序错误的表述是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":26},"先整体后局部",{"key":24,"text":196,"correct":26},"先文字说明后图样",{"key":28,"text":198,"correct":26},"先图形后尺寸",{"key":31,"text":200,"correct":22},"先局部后整体",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1160024,"建筑施工图中用于的标注标高的图例为（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"②",{"key":24,"text":208,"correct":22},"③",{"key":28,"text":210,"correct":26},"④",{"key":31,"text":212,"correct":26},"⑤",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},1160025,"图例 ①的含义表述错误的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"这种表示方法叫作详图索引标志",{"key":24,"text":220,"correct":26},"图中圆圈中的“分子”数“5”表示详图的编号",{"key":28,"text":222,"correct":22},"图中圆圈中的“分子”数“5”表示画详图的那张图纸的编号",{"key":31,"text":224,"correct":26},"图中圆圈中的“分母”数“3”表示画详图的那张图纸的编号",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1160026,"通过阅读，本图名称是（ ）。",[229,230,232,234],{"key":20,"text":51,"correct":26},{"key":24,"text":231,"correct":22},"建筑总平面图",{"key":28,"text":233,"correct":26},"施工平面布置图",{"key":31,"text":235,"correct":26},"建筑立面图",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1160027,"对砌筑砂浆的技术要求不包括（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"坍落度",{"key":24,"text":243,"correct":26},"强度",{"key":28,"text":245,"correct":26},"粘结性",{"key":31,"text":247,"correct":26},"保水性",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1160028,"箱形基础采用机械开挖基坑时，应在基坑底面以上保留（ ）厚的土层采用人工挖除。",[252,254,256,258],{"key":20,"text":253,"correct":22},"200～400mm",{"key":24,"text":255,"correct":26},"300～500mm",{"key":28,"text":257,"correct":26},"400～600mm",{"key":31,"text":259,"correct":26},"500～700mm",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1160029,"下列各项中，关于混凝土拌合料运输过程中一般要求不正确的说法是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"保持其均匀性，不离析、不漏浆",{"key":24,"text":267,"correct":26},"保证混凝土浇筑能连续进行",{"key":28,"text":269,"correct":26},"运到浇筑地点时应具有设计配合比所规定的坍落度",{"key":31,"text":271,"correct":22},"应在混凝土终凝前浇入模板并捣实完毕",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1160030,"模板拆除顺序应按设计方案进行。当无规定时，应按按照（ ）顺序拆除混凝土模板。",[276,278,280,282],{"key":20,"text":277,"correct":22},"先支后拆，后支先拆",{"key":24,"text":279,"correct":26},"先支先拆，后支后拆",{"key":28,"text":281,"correct":26},"先拆承重模板，后拆非承重模板",{"key":31,"text":283,"correct":26},"先拆复杂部分，后拆简单部分",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},1160031,"脚手架使用要求，当遇（ ）以上大风、大雪、大雨、大雾天气下应暂停在脚手架上作业。",[288,290,292,294],{"key":20,"text":289,"correct":26},"四级",{"key":24,"text":291,"correct":26},"五级",{"key":28,"text":293,"correct":22},"六级",{"key":31,"text":295,"correct":26},"七级",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},1160032,"下列关于防水工程的说法中，不正确的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"防水混凝土多采用较大的水灰比，降低水泥用量和砂率，选用较小的骨料直径",{"key":24,"text":303,"correct":26},"根据所用材料不同，防水工程可分为柔性防水和刚性防水",{"key":28,"text":305,"correct":26},"按工程部位和用途，防水工程又可分为屋面防水工程、地下防水工程、楼地面防水工程",{"key":31,"text":307,"correct":26},"防水砂浆防水通过增加防水层厚度和提高砂浆层的密实性来达到防水要求",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},1160033,"钢筋混凝土柱的施工缝一般不宜留置在（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"基础顶面",{"key":24,"text":315,"correct":26},"吊车梁牛腿的下面",{"key":28,"text":317,"correct":22},"吊车梁的下面",{"key":31,"text":319,"correct":26},"无梁楼盖柱帽的下面",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},1160034,"预制桩的强度应达到设计强度标准值的（ ）后方可运输。",[324,326,328,330],{"key":20,"text":325,"correct":26},"25％",{"key":24,"text":327,"correct":26},"50％",{"key":28,"text":329,"correct":26},"75％",{"key":31,"text":331,"correct":22},"100％",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1160035,"不属于钢框木（竹）胶合板模板的面板有（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"木胶合板",{"key":24,"text":339,"correct":26},"竹胶合板",{"key":28,"text":341,"correct":22},"纤维板",{"key":31,"text":343,"correct":26},"单片木面竹芯胶合板",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1160036,"混凝土构件的施工缝的留设位置不正确的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"柱应留置在基础顶面、梁或吊车梁牛腿的下面、无梁楼盖柱帽的下面",{"key":24,"text":351,"correct":26},"双向受力板、拱、薄壳应按设计要求留设",{"key":28,"text":353,"correct":22},"单向板留置在平行于板的长边任何位置",{"key":31,"text":355,"correct":26},"有主次梁的楼板留置在次梁跨度的中间1\u002F3范围内",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1160037,"高强度螺栓的拧紧问题说法错误的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"高强度螺栓连接的拧紧应分为初拧、终拧",{"key":24,"text":363,"correct":26},"对于大型节点应分为初拧、复拧、终拧",{"key":28,"text":365,"correct":22},"复拧扭矩应当大于初拧扭矩",{"key":31,"text":367,"correct":26},"扭剪型高强度螺栓拧紧时对螺母施加顺时针力矩",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1160038,"现浇钢筋混凝土框架结构中竖向钢筋的连接，宜采用（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"闪光对焊",{"key":24,"text":375,"correct":26},"电弧焊",{"key":28,"text":377,"correct":26},"电阻点焊",{"key":31,"text":379,"correct":22},"电渣压力焊",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1160039,"钢筋进行冷拉加工时，常采用控制钢筋的（ ）和冷拉率两种方法。",[384,385,387,389],{"key":20,"text":243,"correct":26},{"key":24,"text":386,"correct":26},"冷弯性能",{"key":28,"text":388,"correct":22},"应力",{"key":31,"text":390,"correct":26},"变形",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},1160040,"下列关于涂料防水施工工艺的说法中，错误的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"防水涂料防水层属于柔性防水层",{"key":24,"text":398,"correct":26},"一般采用外防外涂和外防内涂施工方法",{"key":28,"text":400,"correct":22},"其施工工艺流程为：找平层施工→保护层施工→防水层施工→质量检查",{"key":31,"text":402,"correct":26},"找平层有水泥砂浆找平层、沥青砂浆找平层、细石混凝土找平层三种",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},1160041,"下列焊接方法中，不属于钢结构工程常用的是（ ）。",[407,409,410,412],{"key":20,"text":408,"correct":26},"自动（半自动）埋弧焊",{"key":24,"text":373,"correct":22},{"key":28,"text":411,"correct":26},"药皮焊条手工电弧焊",{"key":31,"text":413,"correct":26},"气体保护焊",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},1160042,"某混凝土梁的跨度为8.0m，采用木模板、钢支柱支模时，混凝土梁跨中的起拱高度宜为（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"6mm",{"key":24,"text":421,"correct":26},"7mm",{"key":28,"text":423,"correct":22},"11mm",{"key":31,"text":425,"correct":26},"30mm",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1160043,"砖砌体的施工工艺过程正确是的（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"找平、放线、摆砖样、盘角、立皮数杆、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"key":24,"text":433,"correct":22},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、清理、勾缝、楼层轴线标引、楼层标高控制等",{"key":28,"text":435,"correct":26},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、勾缝、清理、楼层轴线标引、楼层标高控制等",{"key":31,"text":437,"correct":26},"找平、放线、立皮数杆、摆砖样、盘角、挂线、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},1160044,"下列关于掺防水剂水泥砂浆防水施工的说法中，错误的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"施工工艺流程为：找平层施工→防水层施工→质量检查",{"key":24,"text":445,"correct":22},"当施工采用抹压法时，先在基层涂刷一层1:0.4的水泥浆，随后分层铺抹防水砂浆，每层厚度为10～15mm，总厚度不小于30mm",{"key":28,"text":447,"correct":26},"氯化铁防水砂浆施工时，底层防水砂浆抹完12h后，抹压面层防水砂浆，其厚13mm分两遍抹压",{"key":31,"text":449,"correct":26},"防水层施工时的环境温度为5～35℃",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":31,"analysis":33},1160045,"屋面防水分为（ ）等级。",[454,456,458,460],{"key":20,"text":455,"correct":26},"一",{"key":24,"text":457,"correct":26},"二",{"key":28,"text":459,"correct":26},"三",{"key":31,"text":461,"correct":22},"四",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1160046,"施工缝一般应留在构件（ ）部位。",[466,468,470,472],{"key":20,"text":467,"correct":26},"受压最小",{"key":24,"text":469,"correct":22},"受剪最小",{"key":28,"text":471,"correct":26},"受弯最小",{"key":31,"text":473,"correct":26},"受扭最小",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1160047,"滑动模板（简称滑模）施工，是现浇混凝土工程的一项施工工艺，与常规施工方法相比，下列关于滑模的说法不正确的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"这种施工工艺具有施工速度快、机械化程度高。",{"key":24,"text":481,"correct":26},"可节省支模和搭设脚手架所需的工料，",{"key":28,"text":483,"correct":26},"能较方便地将模板进行拆散和灵活组装并可重复使用。",{"key":31,"text":485,"correct":22},"滑模属于组合式模板。",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},1160048,"下列关于地下连续墙的说法错误的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"地下连续墙可用作支护结构",{"key":24,"text":493,"correct":26},"地下连续墙挡土又挡水",{"key":28,"text":495,"correct":26},"地下连续墙可用作建筑物的承重结构",{"key":31,"text":497,"correct":22},"地下连续墙不可作为地下室的外墙",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1160049,"砖砌体砌筑时应遵循的原则不包括（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"砖块应错缝搭接",{"key":24,"text":505,"correct":26},"必须控制水平灰缝的厚度",{"key":28,"text":507,"correct":26},"墙体间联结牢固",{"key":31,"text":509,"correct":22},"砖必须充分浇水后再砌",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1160050,"流平性差的涂料，为便于抹压，加快施工进度，可以采用分条间隔施工的方法，条带宽（ ）mm。",[514,516,518,520],{"key":20,"text":515,"correct":26},"600～8000",{"key":24,"text":517,"correct":26},"700～900",{"key":28,"text":519,"correct":22},"800～1000",{"key":31,"text":521,"correct":26},"900～1200",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1160051,"混凝土施工缝宜留置在结构受剪力比较小且便于施工的部位，柱的施工缝留设位置不正确的是（ ）。",[526,528,529,531],{"key":20,"text":527,"correct":26},"基础的顶面",{"key":24,"text":317,"correct":22},{"key":28,"text":530,"correct":26},"吊车梁的上面",{"key":31,"text":319,"correct":26},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},1160052,"下列各项中，不属于混凝土工程施工内容的是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":26},"混凝土拌合料的制备",{"key":24,"text":539,"correct":26},"混凝土拌合料的养护",{"key":28,"text":541,"correct":22},"混凝土拌合料的强度测定",{"key":31,"text":543,"correct":26},"混凝土拌合料的振捣",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":31,"analysis":33},1160053,"下列各项中，关于钢筋连接的基本规定不正确的说法是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"钢筋的连接可分为绑扎连接、焊接和机械连接三种",{"key":24,"text":551,"correct":26},"在任何情况下，纵向受拉钢筋绑扎搭接接头的搭设长度不应小于300mm，纵向受压钢筋的搭接长度不应小于200mm",{"key":28,"text":553,"correct":26},"钢筋机械连接有钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋镦粗直螺纹套筒连接、钢筋滚压直螺纹套筒连接",{"key":31,"text":555,"correct":22},"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1160054,"砌筑用水泥砂浆应随拌随用，一般在拌制后（ ）h内用完，如气温高于30℃时，还应缩短1h。",[560,562,564,566],{"key":20,"text":561,"correct":26},"2",{"key":24,"text":563,"correct":22},"3",{"key":28,"text":565,"correct":26},"4",{"key":31,"text":567,"correct":26},"5",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},1160055,"某混凝土实验室配合比为1：2.3：4.4，水灰比为0.55，现场砂含水率为3％，石子的含水率为1％，则施工的配合比为（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":26},"1：2.3：4.4",{"key":24,"text":575,"correct":26},"1：2.33：4.41",{"key":28,"text":577,"correct":26},"1：2.35：4.43",{"key":31,"text":579,"correct":22},"1：2.37：4.44",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},1160056,"内墙饰面砖镶贴前应在水泥砂浆基层上弹线分格，弹出水平、垂直控制线。在同一墙面上的横、竖排列中，不宜有一行以上的非整砖，非整砖行应安排在次要部位或（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":26},"阳角处",{"key":24,"text":587,"correct":26},"转弯处",{"key":28,"text":589,"correct":22},"阴角处",{"key":31,"text":591,"correct":26},"阳台下口",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1160057,"裱糊工程完成后，各幅拼接横平竖直，拼接处的花纹、图案吻合，不空鼓，无气泡，不显拼缝，对拼缝的检查应该在距离（ ）处看不出接缝，斜视无胶迹。",[596,598,600,602],{"key":20,"text":597,"correct":26},"1.0m",{"key":24,"text":599,"correct":22},"1.5m",{"key":28,"text":601,"correct":26},"2.0m",{"key":31,"text":603,"correct":26},"2.5m",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":31,"analysis":33},1160058,"浅基础施工程序正确的是：（ ）",[608,610,612,614],{"key":20,"text":609,"correct":26},"定位放线→产验槽→开挖土方→浇垫层→立模、扎钢筋→浇混冱土、养护→回填",{"key":24,"text":611,"correct":26},"定位放线→浇垫层→开挖土方→验槽→浇混凝、养护→立模、扎钢筋→回填",{"key":28,"text":613,"correct":26},"定位放线→开挖土方→验槽→立模、扎钢筋→浇垫层→浇混凝土、养护→回填",{"key":31,"text":615,"correct":22},"定位放线→开挖土方→验槽→浇垫层→立模、扎钢筋→浇混凝土、养护→回填",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]