[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,26,50,1385,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1161116,3,"判断题","利用坡屋顶内空间时净高超过2.10m的部位应计算全面积；净高在1.20?2.10m的部位应计算1\u002F2面积;净高不足1.20m的部位不应计算面积。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1161117,"工程量清单项目编码，应采用十二位阿拉伯数字表示。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1161118,"建筑物的外墙外保温层应按其水平截面积计算，并计人自然层建筑面积。（ ）。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1161119,"工程定额反映了在一定社会生产力条件下，建筑行业生产与管理的社会平均水平或平均先进水平。（ ）",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1161120,"建筑物的门厅、大厅应按自然层计算建筑面积。（ ）。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1161121,"材料消耗量定额必须遵循综合经济效益的原则，主要强调节约材料。（ ）",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1161122,"挖土放坡应按图纸尺寸计算工程量，挖土交接处产生的重复工程量不扣除（ ）。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1161123,"在生产性建设工程中，设备、工器具购置费用占工程造价的比重的增大，意味着生产技术的进步和资本有机构成的提高。（ ）",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1161124,"暂列金额是招标人用于支付必然要发生但暂时不能确定价格的材料以及需另行发包的专业工程金额。（ ）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1161125,"施工定额是以同一性质的施工过程一工序作为对象编制。（ ）。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1161126,"国家融资项目投资的工程建设项目属于国有资金投机的建设工程项目，但不必须采用工程量清单计价。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1161127,"外墙面装饰抹灰面积，扣除门窗洞口和0．3㎡以下的孔洞所占的面积。（ ）。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1161128,"分项工程的实际做法和工作内容必须与定额项目规定的达到80%及以上相符时才能直接套用。（ ）",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1161129,"工程量是以物理计量单位或自然计量单位表示的建筑工程的各分项工程或结构构件的实体数量。（ ）。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1161130,"计日工指完成发包人提出的施工图纸以外的零星项目或工作，按合同中约定的综合单价计价。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1161131,"施工合同签订时尚未确定或者不可预见的所需材料、设备费为暂估价。（ ）",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1161132,"建设项目投资含固定资产投资和流动资产投资两部分。（ ）",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1161133,"人行道块料铺设面积计算按实铺面积计算。（ ）。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1161134,"地区统一定额只能在本地区范围内使用。（ ）",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1161135,"机械台班定额是指生产单位和各产品所必须消耗的某种施工机械作业时间的数量标准或在单位时间内某种施工机械完成所有产品的数量标准（ ）",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1161136,"“13计量规范”以成品考虑的项目，如采用现场制作的，应包括制作的工作内容。（ ）",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1161137,"预算定额是在概算定额的基础上综合扩大而成的。（ ）",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1161138,"材料原价是指材料、工程设备的出厂价格或商家供应价格。（ ）。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1161139,"劳动定额一般采用工作时间消耗量来计算人工工日消耗的数量，所以其主要表现形式是产量定额。（ ）",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1161140,"建设项目总投资中的固定资产投资与建设项目的工程造价在量上相等。（ ）",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1161141,"从市场交易的角度而言，工程造价是指建设一项工程预期开支或实际开支的全部固定资产投资费用。（ ）",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1161142,"概算指标是概算定额的扩大与合并。（ ）",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1161143,"材料脱离了制造生产过程，进入到再生产消耗过程统称为材料储备。（ ）",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1161144,"在材料采购的过程中，对于不能实现随需随购的材料以及零星够买的材料，应进行分批采购，计划储存。（ ）",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1161145,"临时使用的设备通常采用经营租赁。（ ）",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1161146,"安全防护用具和劳保用品都属于B类物资。（ ）。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1161147,"按照材料供应中对数量的管理方法不同，材料供应方式有限额供应和敞开供应。（ ）",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1161148,"按照材料流通工程项目过程经过的环节不同，材料供应方式有领料方式和送料方式。（ ）",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1161149,"建筑企业的材料管理工作应本着“管物资必须全面管供、管用、管节约和管回收、修旧利废\\\"的原则。（ ）。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1161150,"材料运输是材料供应活动中的组成部分和业务环节之一。（ ）",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1161151,"机具租赁是在一定的期限内，机具的所有者在不改变所有权的条件下，有偿地向使用者提供机具的使用权，一方承担一定的义务的一种经济关系。（ ）。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1161152,"管理层材料管理的任务主要是管理好领料、用料及核算工作。（ ）。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1161153,"在选择机械设备时机械设备的能源耗费越少越好。（ ）",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1161154,"建筑机械设备使用单位、拆装单位必须要有与资质标准对应的机械设备专业技术人员并现场持原件交监理工程师核验后上岗作业。（ ）。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1161155,"特种作业人员（起重机械、起吊指挥、挂钩作业人员、电梯驾驶等）必须按国家和省、市安全生产监察局的要求培训和考试，取得省、市安全生产监察局颁发的“特种作业人员安全操作证\\\"后，方可上岗操作，并按归家规定的要求和期限进行审证。（ ）。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1161156,"按照供应单位在建筑施工中的地位不同，材料供应方式分为甲方供应方式和乙方供应方式。（ ）",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1161157,"物资供销体制具体规定了物资流通领域内购销环节的关系、权限分工和组织形式（ ）。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1161158,"材料管理的三个方面就是指建筑材料的供、管、用，它们是紧密结合的。（ ）。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1161159,"磨具材料的干燥可采用日晒或烘干。（ ）",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1161160,"材料管理的两个领域就是指物资流通领域的材料管理和生产领域的材料管理（ ）。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1161161,"设备管理的主要目的是用技术上先进、经济上合理的装备，采取有效措施，保证设备高效率、长周期）。、安全、经济地运行，来保证企业获得最好的经济效益。（ ）",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1161162,"按机具的性能分类，有电动机具、手动机具两类、借人机具。（ ）。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1161163,"按照考核指标的表现形式不同，材料核算分为货币核算和统计核算。（ ）",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1161164,"重型机械设备已采用经营租赁。（ ）",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1161165,"建筑工程材料计划的类型不同、用途不同，编制的依据和方法就不同。（ ）",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]