[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,24,50,1385,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1161016,3,"判断题","坚石和特坚石的现场鉴别方法都可以是用爆破方法。（ ）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1161017,"柱钢筋绑扎的施工工艺流程为：调整插筋位置，套入箍筋→立柱子四个角的主筋→立柱内其余主筋→绑扎钢筋接头→将主骨架钢筋绑扎成形。（ ）",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1161018,"梁和板一般同时浇筑，从一端开始向前推进。只有当梁高大于1m时才允许将梁单独浇筑，此时的施工缝留在楼板板面下20、30mm处。（ ）",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1161019,"为了保证钢结构的安装质量，在运输及吊机吊装能力的范围内，尽量扩大分段拼装的段长，减少现场拼缝焊接量和散件拼装量。（ ）",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1161020,"引弧和熄弧板应采用气割方法切除，并修磨平整，可用锤击落。（ ）",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1161021,"基底清理不干净是导致楼面砂浆面层空鼓常见原因之一。（ ）",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1161022,"钢筋备料、加工的依据是钢筋配料单。（ ）",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1161023,"按工程部位和用途，防水工程又可分为屋面防水工程、地下防水工程、楼地面防水工程三大类。（ ）",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1161024,"在雨期施工，砖必须集中码放，不宜浇水，砌体砌筑高度不宜超过1.5m。（ ）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1161025,"框架梁、牛腿及柱帽等钢筋，应放在柱的纵向钢筋外侧。（ ）",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1161026,"砌筑砂浆有水泥砂浆和水泥混合砂浆及石灰砂浆，分别适用于不同的环境和对象。（ ）",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1161027,"高级抹灰由一底层、一中层、一面层构成。施工要求阴阳角找方，设置标筋，分层赶平、修整，表面压光。（ ）",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1161028,"饰面砖应镶贴在干燥、干净的基层上，同时应保证基层的平整度、垂直度和阴、阳角方正。（ ）",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1161029,"土方回填压实的施工工艺流程：填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验，符合设计要求后，填筑上一层。（ ）",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1161030,"为了提高混凝土的防水要求，可在混凝土中加入一定量的外加剂。（ ）",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1161031,"等节拍流水一般适用于工程规模较小，建筑结构比较简单，施工过程不多的房屋或某些建筑物。（ ）。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1161032,"项目资源管理的最根本意义在于节约活劳动和物化劳动。（ ）",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1161033,"质量控制的工作内容包括了作业技术和活动，也就是包括专业技术和管理技术两个方面。（ ）",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1161034,"项目经理已经安排了栋号经理管理安全工作，就可以不对单栋建筑的安全负责。（ ）",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1161035,"项目是指为达到符合规定要求的目标，按限定时间、限定资源和限定质量标准等约束条件完成的，由一系列相互协调的受控活动组成的特定过程。（ ）",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1161036,"施工项目是指建筑企业自施工投标开始到保修期满为止的全部过程中完成的项目。（ ）",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1161037,"事件中的起重工持有起重作业的特种作业证书，所以本项目施工中其承担起重作业的做法正确。（ ）",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1161038,"施工项目的机械设备管理主要是指作为大型工具使用的大、中型设备，小型机械不在范围之内。（ ）",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1161039,"人力资源泛指能够从事生产活动的体力和脑力劳动者，在项目管理中包括不同层次的管理人员和参加作业的各种工人。（ ）",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1161040,"施工现场包括红线以内占用的建筑用地和施工用地以及临时施工用地。（ ）",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1161041,"某施工项目为8000㎡的公共建筑工程施工，按照要求，须实行施工项目管理。（ ）",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1161042,"在项目运行过程中，实现资源的动态管理。动态管理的基本内容就是按照项目的外在规律，有效计划、组织、协调、控制各种资源，使之在项目实施过程中合理流动，在动态中寻求平衡。（ ）",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1161043,"施工单位的质量控制目标，是通过施工过程的全面质量监督管理、协调和决策，保证竣工项目达到投资决策所确定的质量标准。（ ）。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1161044,"流水参数主要包括工艺参数、空间参数与时间参数类。（ ）。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1161045,"依次施工是指把施工对象划分成若干部分，组织同一施工过程的不同班组在各部分同时开始平行作业。（ ）。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1161046,"工程项目质量管理通常采用PDCA循环方法。PDCA分为四个阶段，即计划P（Plan）、执行D（Do）、检查C（Check）和处置A（Action）阶段。（ ）。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1161047,"质量管理的定义是：在质量方面指挥和控制组织的协调的活动。（ ）。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1161048,"项目管理是指项目管理者为达到项目的目标，运用系统理论和方法对项目进行的策划、组织、控制、协调等活动过程的总称。（ ）",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1161049,"安全管理的对象是生产中一切人、物、环境、管理状态，安全管理是一种动态管理。（ ）",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1161050,"施工项目质量的影响因素有人、机、料、法、环境因素等。（ ）。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1161051,"项目经理部是工程的主管部门，主要负责工程项目在保修期间问题的处理，包括因质量问题造成的返修、工程剩余价款的结算以及回收等。（ ）",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1161052,"施工项目管理的主体是以项目负责人为首的项目经理部，即作业管理层，管理的客体是具体的施工对象、施工活动及相关生产要素。（ ）。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1161053,"建设项目管理的对象是建设项目。（ ）",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1161054,"一般项目指建筑工程中对安全、卫生、环境保护和公共利益起决定性作用的检验项目。（ ）。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1161055,"赢得值法基本参数有3项，即已完工作预算费用、计划工作预算费用和已完工作实际费用。（ ）。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1161056,"在流水节拍是指前后两个相邻的施工过程先后开工的时间间隔。（ ）。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1161057,"在工程项目施工过程中，可以采用以下三种组织方式：依次施工、平行施工与流水施工。（ ）。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1161058,"施工项目的生产要素主要包括劳动力、材料、技术和资金。（ ）",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1161059,"施工成本可以按成本组成分解为人工费、材料费、施工机械使用费、措施费和间接费。（ ）。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1161060,"项目质量控制贯穿于项目施工的全过程。（ ）",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1161061,"时间参数主要包括流水节拍、流水步距与施工段数。（ ）。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1161062,"施工项目管理组织机构形式中工作队式项目组织适用于大型项目、工期要求紧，要求多工种，多部门密切配合的项目。（ ）",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1161063,"施工项目的进度控制采用实际进度与计划进度对比的方法，以应急检查为主，定期检查为辅，对进度实施跟踪控制。（ ）",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1161064,"在现代施工企业的项目管理中，施工项目经理是施工项目的最高责任人和组织者，是决定施工项目盈亏的关键性角色。（ ）",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1161065,"在工程开工前，由项目经理组织编制施工项目管理实施规划，对施工项目管理从开工到交工验收进行全面的指导性规划。（ ）",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]