[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,17,50,1385,[13,38,53,68,83,98,113,128,143,158,173,187,202,216,230,244,256,270,284,298,312,326,341,356,370,385,400,414,429,444,458,473,487,501,516,530,544,558,573,587,601,615,629,640,654,669,682,696,710,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1160665,2,"多选题","下列关于成本控制的表述，正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","成本控制仅仅依靠项目经理和部分管理人员是不能完成的",true,{"key":24,"text":25,"correct":26},"B","成本控制发生的时段应按照计划进行，而不是越短越好",false,{"key":28,"text":29,"correct":22},"C","在成本控制过程中要坚持目标风险分担的原则",{"key":31,"text":32,"correct":26},"D","成本控制的重点“亏损\\\"，不包括项目实施过程的盈余现象",{"key":34,"text":35,"correct":22},"E","成本控制要注意成本支出节流的同时，还要注意开源","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1160666,"质量验收的基本单元是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"单位工程",{"key":24,"text":45,"correct":26},"单项工程",{"key":28,"text":47,"correct":26},"分部工程",{"key":31,"text":49,"correct":22},"检验批",{"key":34,"text":51,"correct":26},"分项工程","AD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1160667,"以下（ ）属于特种作业人员。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"电工",{"key":24,"text":60,"correct":22},"起重机械安装拆卸工",{"key":28,"text":62,"correct":22},"架子工",{"key":31,"text":64,"correct":22},"高处作业吊篮安装拆卸工",{"key":34,"text":66,"correct":26},"钢筋工","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1160668,"施工项目质量控制体系建立的原则有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"分层次规划原则",{"key":24,"text":75,"correct":26},"界面划分交叉原则",{"key":28,"text":77,"correct":22},"总目标分解原则",{"key":31,"text":79,"correct":22},"质量责任制原则",{"key":34,"text":81,"correct":22},"系统有效性原则","ACDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1160669,"项目可行性研究直接影响项目的（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"工程勘察设计质量",{"key":24,"text":90,"correct":22},"决策质量",{"key":28,"text":92,"correct":22},"设计质量",{"key":31,"text":94,"correct":26},"工程施工质量",{"key":34,"text":96,"correct":26},"工程竣工验收质量","BC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1160670,"根据住房城乡建设部《房屋建筑工程施工旁站监理管理办法（试行）》的规定，旁站监理是指“监理人员在房屋建筑工程施工阶段监理中，对（ ）的施工质量实施全过程现场跟班的监督活动”",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"关键工种",{"key":24,"text":105,"correct":26},"关键岗位",{"key":28,"text":107,"correct":22},"关键部位",{"key":31,"text":109,"correct":26},"关键路线",{"key":34,"text":111,"correct":22},"关键工序","CE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1160671,"质量管理和其他各项管理工作一样，要做到有计划、有措施、有执行、有检查、有总结，可能使整个管理工作循序渐进，保证工程质量不断提高。通常采用PDCA循环方法。PDCA分为四个阶段，即（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"计划",{"key":24,"text":120,"correct":22},"执行",{"key":28,"text":122,"correct":22},"检查",{"key":31,"text":124,"correct":26},"总结",{"key":34,"text":126,"correct":22},"处置","ABCE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1160672,"施工准备阶段的安全技术措施包括（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"技术准备",{"key":24,"text":135,"correct":22},"物质准备",{"key":28,"text":137,"correct":22},"施工现场准备",{"key":31,"text":139,"correct":26},"施工班组准备",{"key":34,"text":141,"correct":26},"安全措施准备","ABC",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},1160673,"下列关于施工项目目标控制的措施说法错误的是（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":26},"建立完善的工程统计管理体系和统计制度属于信息管理措施",{"key":24,"text":150,"correct":22},"主要有组织措施、技术措施、合同措施、经济措施和管理措施",{"key":28,"text":152,"correct":26},"落实施工方案，在发生问题时，能适时调整工作之间的逻辑关系，加快实施进度属于技术措施",{"key":31,"text":154,"correct":22},"签订并实施关于工期和进度的经济承包责任制属于合同措施",{"key":34,"text":156,"correct":26},"落实各级进度控制的人员及其具体任务和工作责任属于组织措施","BD",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},1160674,"施工项目质量控制体系应按层次性原则划分为两个层次，第一层次是对（ ）的质量控制体系进行设计。",[162,164,166,168,170],{"key":20,"text":163,"correct":22},"建设单位",{"key":24,"text":165,"correct":22},"工程总承包企业",{"key":28,"text":167,"correct":26},"设计单位",{"key":31,"text":169,"correct":26},"施工企业",{"key":34,"text":171,"correct":26},"监理企业","AB",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":112,"analysis":37},1160675,"下列各部门中，不属于项目经理部可设置的是（ ）。",[177,179,181,183,185],{"key":20,"text":178,"correct":26},"经营核算部门",{"key":24,"text":180,"correct":26},"物质设备供应部门",{"key":28,"text":182,"correct":22},"设备检查检测部门",{"key":31,"text":184,"correct":26},"测试计量部门",{"key":34,"text":186,"correct":22},"企业工程管理部门",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},1160676,"项目经理部物资设备供应部门的主要工作有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":26},"劳动管理",{"key":24,"text":194,"correct":26},"工程预结算",{"key":28,"text":196,"correct":26},"资金收支",{"key":31,"text":198,"correct":22},"材料的询价",{"key":34,"text":200,"correct":22},"机械设备的租赁配套使用","DE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":67,"analysis":37},1160677,"以下属于施工项目资源管理的内容的是（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"劳动力",{"key":24,"text":209,"correct":22},"材料",{"key":28,"text":211,"correct":22},"技术",{"key":31,"text":213,"correct":22},"机械设备",{"key":34,"text":215,"correct":26},"施工现场",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":52,"analysis":37},1160678,"在ABC分类法中，下列关于A类问题的说法中正确的是（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"累计频率在0～80％区间的问题",{"key":24,"text":223,"correct":26},"应按照常规适当加强管理",{"key":28,"text":225,"correct":26},"为次重要问题",{"key":31,"text":227,"correct":22},"要进行重点管理",{"key":34,"text":229,"correct":26},"为最不重要的问题",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":142,"analysis":37},1160679,"项目中人力资源的使用，关键在（ ）。从劳动者个人的需要和行为科学的观点出发，责任和权利相结合，采取激励措施，并在使用中重视对他们的培训，提高他们的综合素质。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"明确责任",{"key":24,"text":237,"correct":22},"调动职工的劳动积极性",{"key":28,"text":239,"correct":22},"提高工作效率",{"key":31,"text":241,"correct":26},"不断获取项目所需人员",{"key":34,"text":243,"correct":26},"将其整合到项目组织之中，使之与项目团队融为一体",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":127,"analysis":37},1160680,"施工项目质量的影响因素有（ ）。",[248,250,251,252,254],{"key":20,"text":249,"correct":22},"人",{"key":24,"text":209,"correct":22},{"key":28,"text":213,"correct":22},{"key":31,"text":253,"correct":26},"法律法规",{"key":34,"text":255,"correct":22},"工艺方法",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":127,"analysis":37},1160681,"影响施工项目进度的因素有（ ）。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"人的干扰因素",{"key":24,"text":263,"correct":22},"材料、机具、设备干扰因素",{"key":28,"text":265,"correct":22},"地基干扰因素",{"key":31,"text":267,"correct":26},"政策干扰因素",{"key":34,"text":269,"correct":22},"环境干扰因素",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":67,"analysis":37},1160682,"影响建设工程项目质量的可控因素包括（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"人的因素",{"key":24,"text":277,"correct":22},"技术因素",{"key":28,"text":279,"correct":22},"管理因素",{"key":31,"text":281,"correct":22},"环境因素",{"key":34,"text":283,"correct":26},"社会因素",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":172,"analysis":37},1160683,"施工成本构成的内容包括（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"人工费",{"key":24,"text":291,"correct":22},"材料费",{"key":28,"text":293,"correct":26},"利润",{"key":31,"text":295,"correct":26},"税金",{"key":34,"text":297,"correct":26},"设备工器具购置费",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":127,"analysis":37},1160684,"施工项目资源管理的内容包括（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"人力资源管理",{"key":24,"text":305,"correct":22},"材料管理",{"key":28,"text":307,"correct":22},"机械设备管理",{"key":31,"text":309,"correct":26},"风险管理",{"key":34,"text":311,"correct":22},"资金管理",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":82,"analysis":37},1160685,"施工项目管理具有（ ）特点。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"施工项目管理的主体是建筑企业",{"key":24,"text":319,"correct":26},"施工项目管理的主体是建设单位",{"key":28,"text":321,"correct":22},"施工项目管理的对象是施工项目",{"key":31,"text":323,"correct":22},"施工项目管理的内容是按阶段变化的",{"key":34,"text":325,"correct":22},"施工项目管理要求强化组织协调工作",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":340,"analysis":37},1160686,"资源管理应以（ ）为目的。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"实现资源优化配置",{"key":24,"text":333,"correct":26},"资源使用最高化",{"key":28,"text":335,"correct":22},"动态控制",{"key":31,"text":337,"correct":22},"成本节约",{"key":34,"text":339,"correct":26},"资源使用集中化","ACD",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":355,"analysis":37},1160687,"在工程网络计划中，针对不同的网络计划形式，关键线路有各种不同的表达方式，它可以是指（ ）的线路。",[345,347,349,351,353],{"key":20,"text":346,"correct":26},"双代号网络计划中无虚箭线",{"key":24,"text":348,"correct":22},"双代号时标网络计划中无波形线",{"key":28,"text":350,"correct":22},"单代号网络计划中工作时间间隔为零",{"key":31,"text":352,"correct":22},"双代号网络计划中持续时间最长",{"key":34,"text":354,"correct":26},"单代号网络计划中全由自由时差最小工作连起来","BCD",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":67,"analysis":37},1160688,"安全检查的主要类型除了全面安全检查，经常性安全检查之外，还有（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"专业或者专职安全管理人员的专业安全检查",{"key":24,"text":363,"correct":22},"季节性安全检查",{"key":28,"text":365,"correct":22},"节假日检查",{"key":31,"text":367,"correct":22},"年度性安全检查",{"key":34,"text":369,"correct":26},"要害部门重点安全检查",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":384,"analysis":37},1160689,"检验批质量由（ ）组织施工单位项目专业质量检查员等进行验收。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"总监理工程师",{"key":24,"text":377,"correct":26},"专业监理工程师",{"key":28,"text":379,"correct":22},"建设单位项目专业技术负责人",{"key":31,"text":381,"correct":26},"项目经理",{"key":34,"text":383,"correct":26},"施工单位专业技术负责人","AC",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":399,"analysis":37},1160690,"下列工作中，属于施工阶段的有（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"组建项目经理部",{"key":24,"text":392,"correct":22},"严格履行合同，协调好与建设单位、监理单位、设计单位等相关单位的关系",{"key":28,"text":394,"correct":26},"项目经理组织编制《施工项目管理实施规划》",{"key":31,"text":396,"correct":26},"项目经理部编写开工报告",{"key":34,"text":398,"correct":22},"管理施工现场，实现文明施工","BE",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":142,"analysis":37},1160691,"施工项目进度控制的主要措施有（ ）。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"组织措施",{"key":24,"text":407,"correct":22},"技术措施",{"key":28,"text":409,"correct":22},"合同措施",{"key":31,"text":411,"correct":26},"成本措施",{"key":34,"text":413,"correct":26},"管理措施",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":428,"analysis":37},1160692,"建筑施工特种作业人员是指在房屋建筑和市政工程施工活动中，从事可能对（ ）的安全造成重大危害作业的人员。",[418,420,422,424,426],{"key":20,"text":419,"correct":26},"社会环境",{"key":24,"text":421,"correct":22},"本人",{"key":28,"text":423,"correct":26},"公民",{"key":31,"text":425,"correct":22},"他人",{"key":34,"text":427,"correct":22},"周围设备设施","BDE",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":443,"analysis":37},1160693,"以下各项中属于施工现场管理的内容的是（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":26},"落实资源进度计划",{"key":24,"text":436,"correct":22},"设计施工现场平面图",{"key":28,"text":438,"correct":22},"建立文明施工现场",{"key":31,"text":440,"correct":26},"施工资源进度计划的动态调整",{"key":34,"text":442,"correct":22},"及时清场转移","BCE",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":52,"analysis":37},1160694,"以下各项中不属于施工资源管理的任务的是（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"规划及报批施工用地",{"key":24,"text":451,"correct":26},"确定资源类型及数量",{"key":28,"text":453,"correct":26},"确定资源的分配计划",{"key":31,"text":455,"correct":22},"建立施工现场管理组织",{"key":34,"text":457,"correct":26},"施工资源进度计划的执行和动态调整",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":472,"analysis":37},1160695,"下列选项中，属于项目部设置的最基本的岗位的是（ ）。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"施工员",{"key":24,"text":465,"correct":22},"安全员",{"key":28,"text":467,"correct":26},"机械员",{"key":31,"text":469,"correct":26},"劳务员",{"key":34,"text":471,"correct":22},"测量员","ABE",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":172,"analysis":37},1160696,"工程网络计划能够正确表达工作之间逻辑关系，工作之间的逻辑关系包括（ ）",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"工艺关系",{"key":24,"text":480,"correct":22},"组织关系",{"key":28,"text":482,"correct":26},"生产关系",{"key":31,"text":484,"correct":26},"技术关系",{"key":34,"text":486,"correct":26},"协调关系",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":340,"analysis":37},1160697,"施工项目管理组织的主要形式有（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"工作队项目组织",{"key":24,"text":494,"correct":26},"项目经理式项目组织",{"key":28,"text":496,"correct":22},"部门控制式项目组织",{"key":31,"text":498,"correct":22},"矩阵制式项目组织",{"key":34,"text":500,"correct":26},"班组式项目组织",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":515,"analysis":37},1160698,"建筑产品具有以下特点（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"多样性",{"key":24,"text":508,"correct":22},"固定性",{"key":28,"text":510,"correct":26},"施工的复杂性",{"key":31,"text":512,"correct":22},"体积庞大",{"key":34,"text":514,"correct":26},"流动性","ABD",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":36,"analysis":37},1160699,"项目规模达到以下标准时，才实行施工项目管理（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"1万平米以上的公共建筑",{"key":24,"text":523,"correct":26},"2万平米以上的工业建筑",{"key":28,"text":525,"correct":22},"项目投资在500万以上",{"key":31,"text":527,"correct":26},"项目投资在300万以上",{"key":34,"text":529,"correct":22},"1万平米以上的工业建筑",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":355,"analysis":37},1160700,"建设工程项目施工质量控制的监控主体包括（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"施工各参与方",{"key":24,"text":537,"correct":22},"设计方",{"key":28,"text":539,"correct":22},"业主方",{"key":31,"text":541,"correct":22},"监理方",{"key":34,"text":543,"correct":26},"供货方",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":201,"analysis":37},1160701,"以下不属于施工项目安全组织措施的是（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":26},"建立施工项目安全组织系统",{"key":24,"text":551,"correct":26},"建立与项目安全组织系统相配套的各专业、各部门、各生产岗位的安全责任系统",{"key":28,"text":553,"correct":26},"建立项目经理的安全生产职责及项目班子成员的安全生产职责",{"key":31,"text":555,"correct":22},"提高管理、施工及操作人员自身素质",{"key":34,"text":557,"correct":22},"技术措施、合同措施、经济措施、信息管理措施等",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":572,"analysis":37},1160702,"规费是指省级政府或省级有关权力部门规定必须缴纳的、应计人建筑安装工程造价的费用，包括（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"工程排污费",{"key":24,"text":565,"correct":22},"工程定额测定费",{"key":28,"text":567,"correct":22},"社会保障费",{"key":31,"text":569,"correct":22},"住房公积金",{"key":34,"text":571,"correct":22},"危险作业意外伤害保险","ABCDE",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":52,"analysis":37},1160703,"按工程进度编制施工成本计划，可以在进度计划的（ ）上按时间编制成本支出计划。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"横道图",{"key":24,"text":580,"correct":26},"单代号网络图",{"key":28,"text":582,"correct":26},"双代号网络图",{"key":31,"text":584,"correct":22},"时标网络图",{"key":34,"text":586,"correct":26},"搭接网络图",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":157,"analysis":37},1160704,"下列各项中，不属于施工项目管理的内容的是（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":26},"建立施工项目管理组织",{"key":24,"text":594,"correct":22},"编制《施工项目管理目标责任书》",{"key":28,"text":596,"correct":26},"施工项目的生产要素管理",{"key":31,"text":598,"correct":22},"施工项目的施工情况的评估",{"key":34,"text":600,"correct":26},"施工项目的信息管理",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":201,"analysis":37},1160705,"成本加酬金合同有许多种形式，主要有（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":26},"工程成本总价合同",{"key":24,"text":608,"correct":26},"成本加固定费用合同",{"key":28,"text":610,"correct":26},"成本加固定比例费用合同",{"key":31,"text":612,"correct":22},"成本加奖金合同",{"key":34,"text":614,"correct":22},"最大成本加费用合同",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":36,"analysis":37},1160706,"施工项目应从以下方面进行组织和管理（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"劳动力组织",{"key":24,"text":622,"correct":26},"劳务班组组织",{"key":28,"text":624,"correct":22},"劳务输入",{"key":31,"text":626,"correct":26},"劳务输出",{"key":34,"text":628,"correct":22},"项目经理部对劳务队伍的管理",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":127,"analysis":37},1160707,"进度控制的措施包括（ ）。",[633,634,635,637,639],{"key":20,"text":405,"correct":22},{"key":24,"text":407,"correct":22},{"key":28,"text":636,"correct":22},"经济措施",{"key":31,"text":638,"correct":26},"风险措施",{"key":34,"text":409,"correct":22},{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":97,"analysis":37},1160708,"一个力F沿直角坐标轴方向分解，得出分力FX,FY,假设F与X轴之间的夹角为α，则下列公式正确的是：",[644,646,648,650,652],{"key":20,"text":645,"correct":26},"FX=Fsinα",{"key":24,"text":647,"correct":22},"FX=Fcosα",{"key":28,"text":649,"correct":22},"FY=Fsinα",{"key":31,"text":651,"correct":26},"FY=Fcosα",{"key":34,"text":653,"correct":26},"以上都不对",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":668,"analysis":37},1160709,"以下哪些属于静定结构？（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"板",{"key":24,"text":661,"correct":22},"梁",{"key":28,"text":663,"correct":22},"刚架",{"key":31,"text":665,"correct":22},"桁架",{"key":34,"text":667,"correct":22},"三铰拱","BCDE",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":443,"analysis":37},1160710,"构件的承载力与构件的（ ）等有关。",[673,675,676,678,680],{"key":20,"text":674,"correct":26},"变形",{"key":24,"text":209,"correct":22},{"key":28,"text":677,"correct":22},"截面形状",{"key":31,"text":679,"correct":26},"位置",{"key":34,"text":681,"correct":22},"尺寸",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":340,"analysis":37},1160711,"对于作用在刚体上的力，力的三要素是（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"大小",{"key":24,"text":689,"correct":26},"臂长",{"key":28,"text":691,"correct":22},"方向",{"key":31,"text":693,"correct":22},"作用点",{"key":34,"text":695,"correct":26},"受力面",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":127,"analysis":37},1160712,"物体间相互作用的关系是（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"大小相等",{"key":24,"text":703,"correct":22},"方向相反",{"key":28,"text":705,"correct":22},"沿同一条直线",{"key":31,"text":707,"correct":26},"作用于同一物体",{"key":34,"text":709,"correct":22},"作用于两个物体",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":340,"analysis":37},1160713,"刚体平衡的充分与必要条件是:",[714,715,717,718,720],{"key":20,"text":701,"correct":22},{"key":24,"text":716,"correct":26},"方向相同",{"key":28,"text":703,"correct":22},{"key":31,"text":719,"correct":22},"作用在同一直线",{"key":34,"text":721,"correct":26},"互相垂直",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":736,"analysis":37},1160714,"低碳钢拉伸试验中的应力应变图可分为（ ）阶段。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"弹性阶段",{"key":24,"text":729,"correct":22},"屈服阶段",{"key":28,"text":731,"correct":26},"平衡阶段",{"key":31,"text":733,"correct":22},"强化阶段",{"key":34,"text":735,"correct":22},"颈缩阶段","ABDE",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]