[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-821-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},821,"(材料员)基础知识","建筑工程",0,16,50,1385,[13,38,53,68,83,97,112,127,141,155,169,184,198,210,225,239,253,268,282,297,310,324,338,352,366,381,396,410,424,438,453,468,482,497,512,526,540,554,568,583,598,612,626,640,654,668,681,696,710,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1160615,2,"多选题","跨度6m梁，采用组合钢模板搭设，若底模板起拱高度设计无具体规定时，可取（ ）mm。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","5",false,{"key":24,"text":25,"correct":26},"B","10",true,{"key":28,"text":29,"correct":26},"C","12",{"key":31,"text":32,"correct":26},"D","16",{"key":34,"text":35,"correct":22},"E","20","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1160616,"限额领料的方式有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"按分部工程限额领料",{"key":24,"text":45,"correct":26},"按分项工程限额领料",{"key":28,"text":47,"correct":26},"按分层分段限额领料",{"key":31,"text":49,"correct":26},"按工程部位限额领料",{"key":34,"text":51,"correct":26},"按单位工程限额领料","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1160617,"用于振捣密实混凝土拌合物的机械，按其作业方式可分为（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"插入式振动器",{"key":24,"text":60,"correct":26},"表面振动器",{"key":28,"text":62,"correct":26},"振动台",{"key":31,"text":64,"correct":22},"独立式振动器",{"key":34,"text":66,"correct":26},"附着式振动器","ABCE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1160618,"皮数杆是控制砌体竖向尺寸的标志同时还可以保证砌体的垂直度。一般立于（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"房屋的四大角",{"key":24,"text":75,"correct":26},"内外墙交接处",{"key":28,"text":77,"correct":26},"楼梯间以及洞口多的地方",{"key":31,"text":79,"correct":22},"每隔2、5m立一根",{"key":34,"text":81,"correct":22},"MUIO以上的混合砂浆。","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},1160619,"石材饰面板的安装工艺有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"灌浆法",{"key":24,"text":90,"correct":26},"干挂法",{"key":28,"text":92,"correct":26},"直接粘贴法",{"key":31,"text":94,"correct":22},"压卡法",{"key":34,"text":96,"correct":22},"焊接法",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1160620,"不得在下列墙体或部位中留设脚手眼（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"过梁上与过梁成60°角的三角形范围",{"key":24,"text":104,"correct":22},"宽度小于0.5m的窗间墙",{"key":28,"text":106,"correct":26},"梁或梁垫以下及其左右各500mm的范围内",{"key":31,"text":108,"correct":22},"砖砌体的门窗洞口两侧150mm（石砌体为600mm）的范围内",{"key":34,"text":110,"correct":26},"半砖墙","ACE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1160621,"关于混凝土浇筑的说法中正确的是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"混凝土的浇筑工作应连续进行",{"key":24,"text":119,"correct":26},"混凝土应分层浇筑，分层捣实，但两层混凝土浇捣时间间隔不超过规范规定",{"key":28,"text":121,"correct":22},"在竖向结构中如浇筑高度超过2m时，应采用溜槽或串筒下料",{"key":31,"text":123,"correct":22},"浇筑竖向结构混凝土前，应先在底部填筑一层20～50mm厚、与混凝土内砂浆成分相同的水泥砂浆，然后再浇筑混凝土",{"key":34,"text":125,"correct":26},"浇筑过程应经常观察模板及其支架、钢筋、埋设件和预留孔洞的情况，当发现有变形或位移时，应立即快速处理","ABE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":126,"analysis":37},1160622,"瓷质饰面砖空鼓的原因（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"基层不平整",{"key":24,"text":134,"correct":26},"砖浸水不足",{"key":28,"text":136,"correct":22},"在砖口塞灰",{"key":31,"text":138,"correct":22},"结构强度不足",{"key":34,"text":140,"correct":26},"结合层不饱满",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":67,"analysis":37},1160623,"根据建筑物的性质（ ）等，将屋面防水分为四个等级。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"建筑物的性质",{"key":24,"text":148,"correct":26},"重要程度",{"key":28,"text":150,"correct":26},"使用功能要求",{"key":31,"text":152,"correct":22},"排水坡度",{"key":34,"text":154,"correct":26},"防水层耐用年限",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":82,"analysis":37},1160624,"为了获得质量优良的混凝土拌合物，必须确定搅拌制度，即（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"搅拌时间",{"key":24,"text":162,"correct":26},"投料顺序",{"key":28,"text":164,"correct":26},"进料容量",{"key":31,"text":166,"correct":22},"出料容量",{"key":34,"text":168,"correct":22},"出料时间",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1160625,"饰面工程内容很广，按板面材料分类，主要有天然石板饰面和（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"金属板饰面",{"key":24,"text":176,"correct":22},"花岗岩板饰面",{"key":28,"text":178,"correct":26},"陶瓷面砖饰面",{"key":31,"text":180,"correct":26},"人造石板饰面",{"key":34,"text":182,"correct":22},"大理石饰面","ACD",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":82,"analysis":37},1160626,"防水工程按其按所用材料不同可分为（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"卷材防水",{"key":24,"text":191,"correct":26},"涂料防水",{"key":28,"text":193,"correct":26},"砂浆、混凝土防水",{"key":31,"text":195,"correct":22},"结构自防水",{"key":34,"text":197,"correct":22},"防水层防水",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":82,"analysis":37},1160627,"防水工程按其使用材料可分为（ ）。",[202,203,205,207,208],{"key":20,"text":189,"correct":26},{"key":24,"text":204,"correct":26},"涂膜防水",{"key":28,"text":206,"correct":26},"细石混凝土防水",{"key":31,"text":195,"correct":22},{"key":34,"text":209,"correct":22},"屋面防水",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},1160628,"砌筑砂浆粘结力的大小对砌体的那些方面有影响（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":26},"抗剪强度",{"key":24,"text":217,"correct":26},"抗压能力",{"key":28,"text":219,"correct":22},"抗冻性",{"key":31,"text":221,"correct":26},"稳定性",{"key":34,"text":223,"correct":26},"抗震能力","ABDE",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":52,"analysis":37},1160629,"框式脚手架由钢管制成的框架和（ ）等部分组成。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"扣件",{"key":24,"text":232,"correct":26},"水平撑",{"key":28,"text":234,"correct":26},"栏杆",{"key":31,"text":236,"correct":26},"三角架",{"key":34,"text":238,"correct":26},"底座",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":82,"analysis":37},1160630,"合成高分子防水卷材施工的方法有（ ）。",[243,245,247,249,251],{"key":20,"text":244,"correct":26},"冷粘法",{"key":24,"text":246,"correct":26},"自粘法",{"key":28,"text":248,"correct":26},"热风焊接法",{"key":31,"text":250,"correct":22},"满粘法",{"key":34,"text":252,"correct":22},"热熔法",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":267,"analysis":37},1160631,"造成混凝土麻面、蜂窝、露筋的原因是（ ）。",[257,259,261,263,265],{"key":20,"text":258,"correct":26},"模板拼缝不严，板缝跑浆",{"key":24,"text":260,"correct":26},"模板表面不干净",{"key":28,"text":262,"correct":26},"振捣不密实、漏振",{"key":31,"text":264,"correct":26},"混凝土运送的时间过长或产生离析",{"key":34,"text":266,"correct":22},"钢筋绑扎不牢，振捣时使钢筋移动","ABCD",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":267,"analysis":37},1160632,"模板是现浇混凝土成型用的模具，要求它（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":26},"能保证结构和构件的形状、尺寸的准确",{"key":24,"text":275,"correct":26},"具有足够的承载能力、刚度和稳定性",{"key":28,"text":277,"correct":26},"能可靠地承受浇筑混凝土上的重量、侧压力和施工荷载",{"key":31,"text":279,"correct":26},"装拆方便，能多次周转使用",{"key":34,"text":281,"correct":22},"接缝整齐",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":296,"analysis":37},1160633,"用普通混凝土做屋面防水层时，胶凝材料水泥宜用（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":26},"普通硅酸盐水泥",{"key":24,"text":289,"correct":26},"硅酸盐水泥",{"key":28,"text":291,"correct":22},"矿渣硅酸盐水泥",{"key":31,"text":293,"correct":22},"火山灰水泥",{"key":34,"text":295,"correct":22},"粉煤灰水泥","AB",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":267,"analysis":37},1160634,"模板及其支架系统必须具有足够的（ ），能承受新浇注混凝土的重量和侧压力及振捣器的振捣力等。",[301,303,305,306,308],{"key":20,"text":302,"correct":26},"强度",{"key":24,"text":304,"correct":26},"密闭性",{"key":28,"text":221,"correct":26},{"key":31,"text":307,"correct":26},"刚度",{"key":34,"text":309,"correct":22},"湿度",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":36,"analysis":37},1160635,"砖墙面抹灰层空鼓原因是（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"石灰熟化不够",{"key":24,"text":317,"correct":26},"墙面没有湿润",{"key":28,"text":319,"correct":26},"一次抹灰太厚",{"key":31,"text":321,"correct":26},"基层清理不干净",{"key":34,"text":323,"correct":22},"墙面未设灰饼",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":82,"analysis":37},1160636,"钢结构构件防腐涂料涂装施工常用的方法有（ ）。",[328,330,332,334,336],{"key":20,"text":329,"correct":26},"刷涂",{"key":24,"text":331,"correct":26},"喷涂",{"key":28,"text":333,"correct":26},"滚涂",{"key":31,"text":335,"correct":22},"弹涂",{"key":34,"text":337,"correct":22},"粘贴法",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":111,"analysis":37},1160637,"下列关于防水混凝土施工工艺的说法中，错误的是（ ）。",[342,344,346,348,350],{"key":20,"text":343,"correct":26},"水泥选用强度等级不低于32.5级",{"key":24,"text":345,"correct":22},"在保证能振捣密实的前提下水灰比尽可能小，一般不大于0.6，坍落度不大于50mm",{"key":28,"text":347,"correct":26},"为了有效起到保护钢筋和阻止钢筋的引水作用，迎水面防水混凝土的钢筋保护层厚度不得小于35mm",{"key":31,"text":349,"correct":22},"在浇筑过程中，应严格分层连续浇筑，每层厚度不宜超过300～400mm，机械振捣密实",{"key":34,"text":351,"correct":26},"墙体一般允许留水平施工缝和垂直施工缝",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":111,"analysis":37},1160638,"下列关于模板安装与拆除的基本规定中正确的是（ ）。",[356,358,360,362,364],{"key":20,"text":357,"correct":26},"同一条拼缝上的U行卡，不宜向同一方向卡紧",{"key":24,"text":359,"correct":22},"钢楞宜采用整根杆件，接头宜错开设置，搭接长度不应小于300mm",{"key":28,"text":361,"correct":26},"模板支设时，采用预组拼方法，可以加快施工速度，提高工效和模板的安装质量，但必须具备相适应的吊装设备和有较大的拼装场地",{"key":31,"text":363,"correct":22},"模板拆除时，当混凝土强度大于1.2N\u002Fm㎡时，应先拆除侧面模板，再拆除承重模板",{"key":34,"text":365,"correct":26},"模板拆除的顺序和方法，应按照配板设计的规定进行，遵循先支后拆，先非承重部位，后承重部位以及自上而下的原则",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":380,"analysis":37},1160639,"屋面卷材铺贴时，应按（ ）次序。",[370,372,374,376,378],{"key":20,"text":371,"correct":26},"先高跨后低跨",{"key":24,"text":373,"correct":22},"先低跨后高跨",{"key":28,"text":375,"correct":22},"先近后远",{"key":31,"text":377,"correct":26},"先远后近",{"key":34,"text":379,"correct":26},"先做好泛水，然后铺设大屋面","ADE",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":395,"analysis":37},1160640,"门框安装有（ ）的方法",[385,387,389,391,393],{"key":20,"text":386,"correct":26},"先立口",{"key":24,"text":388,"correct":22},"后立口",{"key":28,"text":390,"correct":26},"后塞口",{"key":31,"text":392,"correct":22},"先塞口",{"key":34,"text":394,"correct":22},"榫卯接头","AC",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":111,"analysis":37},1160641,"模板的拆除程序一般为（ ）。",[400,402,404,406,408],{"key":20,"text":401,"correct":26},"先支后拆",{"key":24,"text":403,"correct":22},"先支先拆",{"key":28,"text":405,"correct":26},"后支先拆",{"key":31,"text":407,"correct":22},"后支后拆",{"key":34,"text":409,"correct":26},"非承重部分先拆后拆除承重部分",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":67,"analysis":37},1160642,"关于防水混凝土后浇带、施工缝说法正确的是（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":26},"应不留或少留施工缝",{"key":24,"text":417,"correct":26},"后浇带的断面形式可留成平直缝或阶梯缝",{"key":28,"text":419,"correct":26},"后浇带应优先选用补偿收缩的混凝土",{"key":31,"text":421,"correct":22},"后浇带浇注后的混凝土养护时间不少于7d",{"key":34,"text":423,"correct":26},"高层建筑的后浇带应在结构顶板浇筑混凝土14d后，再施工后浇带",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":82,"analysis":37},1160643,"饰面板（砖）工程应对下列（ ）隐蔽工程项目进行验收。",[428,430,432,434,436],{"key":20,"text":429,"correct":26},"预埋件（或后置埋件）",{"key":24,"text":431,"correct":26},"连接节点",{"key":28,"text":433,"correct":26},"防水层",{"key":31,"text":435,"correct":22},"阴阳角处搭接方式",{"key":34,"text":437,"correct":22},"饰面砖接缝质量",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":452,"analysis":37},1160644,"基础混凝土质量检查分为施工过程中检查和养护后的检查。其中养护后的质量检查，包括（ ）等的检查。",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"原材料",{"key":24,"text":445,"correct":22},"配合比",{"key":28,"text":447,"correct":26},"混凝土的强度",{"key":31,"text":449,"correct":26},"外观质量",{"key":34,"text":451,"correct":26},"构件的轴线、标高、断面尺寸","CDE",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":467,"analysis":37},1160645,"下列关于涂料防水中质量检查的说法中，正确的是（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":26},"找平层表面平整度的允许偏差为5mm",{"key":24,"text":460,"correct":26},"涂料防水层不得有渗漏或积水现象，其检验方法为：雨后或淋水、蓄水检验",{"key":28,"text":462,"correct":22},"防水涂料和胎体增强材料必须符合设计要求，检验方法为检查出厂合格证和质量检验报告",{"key":31,"text":464,"correct":26},"涂料防水层的平均厚度应符合设计要求，最小厚度不应小于设计厚度的80%",{"key":34,"text":466,"correct":22},"找平层分格缝的位置和间距应符合设计要求，其检验方法为观察检查","ABD",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":183,"analysis":37},1160646,"下列关于柱钢筋和板钢筋绑扎的施工工艺的规定中正确的是（ ）。",[472,474,476,478,480],{"key":20,"text":473,"correct":26},"柱钢筋绑扎中箍筋的接头应交错布置在四角纵向钢筋上，箍筋转角与纵向钢筋交叉点均应扎牢",{"key":24,"text":475,"correct":22},"板钢筋绑扎中板、次梁与主梁交叉处，板的钢筋在上，次梁的钢筋居中。主梁的钢筋一直在下侧",{"key":28,"text":477,"correct":26},"板钢筋绑扎的施工工艺流程为：清理垫层、画线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→安装管线→绑扎上层钢筋",{"key":31,"text":479,"correct":26},"对于双向受力板，应先铺设平行于短边方向的受力钢筋，后铺设平行于长边方向的受力钢筋",{"key":34,"text":481,"correct":22},"板上部的负筋、主筋与分布钢筋的交叉点应相隔交错扎牢，并垫上保护层垫块",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":496,"analysis":37},1160647,"适合石材干挂的基层是（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"砖墙",{"key":24,"text":489,"correct":26},"钢筋混凝土墙",{"key":28,"text":491,"correct":26},"钢骨架墙",{"key":31,"text":493,"correct":22},"加气混凝土墙",{"key":34,"text":495,"correct":22},"灰板条墙","BC",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":511,"analysis":37},1160648,"楼面面层以下构造一般有（ ）。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"基层",{"key":24,"text":504,"correct":22},"垫层",{"key":28,"text":506,"correct":26},"找平层",{"key":31,"text":508,"correct":26},"隔离层",{"key":34,"text":510,"correct":22},"填充层","CD",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":36,"analysis":37},1160649,"外脚手架既可用于外墙砌筑，又可用于外装修施工。其主要形式为（ ）。",[516,518,520,522,524],{"key":20,"text":517,"correct":22},"角钢折叠式脚手架",{"key":24,"text":519,"correct":26},"多立杆式脚手架",{"key":28,"text":521,"correct":26},"桥式脚手架",{"key":31,"text":523,"correct":26},"框式脚手架",{"key":34,"text":525,"correct":22},"支柱式脚手架",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":224,"analysis":37},1160650,"对于扣件式钢管脚手架，下面说法正确的是（ ）。",[530,532,534,536,538],{"key":20,"text":531,"correct":26},"一般由底座、立杆、大横杆、小横杆、斜撑和抛撑等组成",{"key":24,"text":533,"correct":26},"脚手架各杆件相交处伸出的端头，均应大于10cm,以防止杆件滑落。",{"key":28,"text":535,"correct":22},"剪刀撑搭设时，应将一根钢管紧扣在立杆上，另一根紧扣在大横杆上",{"key":31,"text":537,"correct":26},"脚手架的宽度一般为1.5～2.0m",{"key":34,"text":539,"correct":26},"剪刀撑、斜撑主要作用是加强脚手架的整体性，使其更加稳固",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":36,"analysis":37},1160651,"以下关于砖砌体的施工工艺的基本规定中，正确的是（ ）。",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"皮数杆一般立于房屋的四大角、内外墙交接处、楼梯间以及洞口多的洞口。一般可每隔5～10m立一根",{"key":24,"text":547,"correct":26},"一般在房屋外纵墙方向摆顺砖，在山墙方向摆丁砖，摆砖由一个大角摆到另一个大角，砖与砖留10mm缝隙",{"key":28,"text":549,"correct":26},"盘角时主要大角不宜超过5皮砖，且应随起随盘，做到“三皮一吊，五皮一靠”",{"key":31,"text":551,"correct":26},"各层标高除立皮数杆控制外，还可弹出室内水平线进行控制",{"key":34,"text":553,"correct":22},"加浆勾缝系指再砌筑几皮砖以后，先在灰缝处划出2cm深的灰槽",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":67,"analysis":37},1160652,"下列各项中，属于钢筋加工的是（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":26},"钢筋除锈",{"key":24,"text":561,"correct":26},"钢筋调直",{"key":28,"text":563,"correct":26},"钢筋切断",{"key":31,"text":565,"correct":22},"钢筋冷拉",{"key":34,"text":567,"correct":26},"钢筋弯曲成型",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":37},1160653,"钢筋焊接的方法有（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":26},"闪光对焊",{"key":24,"text":575,"correct":22},"熔焊",{"key":28,"text":577,"correct":26},"电渣压力焊",{"key":31,"text":579,"correct":26},"点焊",{"key":34,"text":581,"correct":26},"电弧焊","ACDE",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":597,"analysis":37},1160654,"砌块施工的主要工序有（ ）等。",[587,589,591,593,595],{"key":20,"text":588,"correct":26},"铺灰",{"key":24,"text":590,"correct":26},"吊砌块就位",{"key":28,"text":592,"correct":26},"校正",{"key":31,"text":594,"correct":26},"灌缝",{"key":34,"text":596,"correct":26},"镶砖","ABCDE",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":452,"analysis":37},1160655,"下列关于土方回填压实的基本规定的各项中，正确的是（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"碎石类土、砂土和爆破石渣（粒径不大于每层铺土后2\u002F3）可作各层填料",{"key":24,"text":605,"correct":22},"人工填土每层虚铺厚度，用人工木夯夯实时不大于25cm，用打夯机械夯实时不大于30cm",{"key":28,"text":607,"correct":26},"铺土应分层进行，每次铺土厚度不大于30～50cm（视所用压实机械的要求而定）",{"key":31,"text":609,"correct":26},"当填方基底为耕植土或松土时，应将基底充分夯实和碾压密实",{"key":34,"text":611,"correct":26},"机械填土时填土程序一般尽量采取横向或纵向分层卸土，以利行驶时初步压实",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":126,"analysis":37},1160656,"下列关于钢结构安装施工要点的说法中，有误的是（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":26},"起吊事先将钢构件吊离地面30cm左右，使钢构件中心对准安装位置中心",{"key":24,"text":619,"correct":26},"高强度螺栓上、下接触面处加有1\u002F15以上斜度时应采用垫圈垫平",{"key":28,"text":621,"correct":22},"施焊前，焊工应检查焊接件的接头质量和焊接区域的坡口、间隙、钝边等的处理情况",{"key":31,"text":623,"correct":22},"厚度大于12～20mm的板材，单面焊后，背面清根，再进行焊接",{"key":34,"text":625,"correct":26},"焊道两端加引弧板和熄弧板，引弧和熄弧焊缝长度应大于或等于150mm",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":395,"analysis":37},1160657,"防水涂膜严禁在（ ）等情况下施工。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"雨天、雪天施工",{"key":24,"text":633,"correct":22},"三级风及其以上",{"key":28,"text":635,"correct":26},"预计涂膜固化前有雨时",{"key":31,"text":637,"correct":22},"在气温低于10℃",{"key":34,"text":639,"correct":22},"在气温高于35℃",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":82,"analysis":37},1160658,"跨度为2m,长度为6m的现浇板，施工缝宜留在（ ）位置。",[644,646,648,650,652],{"key":20,"text":645,"correct":26},"平行于板短边1m",{"key":24,"text":647,"correct":26},"平行于板短边2m",{"key":28,"text":649,"correct":26},"平行于板短边3m",{"key":31,"text":651,"correct":22},"平行于板长边1m",{"key":34,"text":653,"correct":22},"平行于板长边1.5m",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":395,"analysis":37},1160659,"若施工中缺乏设计图中所要求的钢筋，征得设计单位同意后，可按（ ）原则进行钢筋现场代换。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"等强度代换",{"key":24,"text":661,"correct":22},"等间距代换",{"key":28,"text":663,"correct":26},"等面积代换",{"key":31,"text":665,"correct":22},"等应力代换",{"key":34,"text":667,"correct":22},"等刚度代换",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":82,"analysis":37},1160660,"防水工程按工程部位可分为（ ）。混凝土防水",[672,673,675,677,679],{"key":20,"text":209,"correct":26},{"key":24,"text":674,"correct":26},"地下防水",{"key":28,"text":676,"correct":26},"卫生间防水",{"key":31,"text":678,"correct":22},"柔性防水",{"key":34,"text":680,"correct":22},"刚性自防水",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":695,"analysis":37},1160661,"下列关于毛石砌体和砌块砌体施工工艺的基本规定中有误的是（ ）。",[685,687,689,691,693],{"key":20,"text":686,"correct":22},"毛石墙砌筑时，墙角部分纵横宽度至少0.8m",{"key":24,"text":688,"correct":22},"对于中间毛石砌筑的料石挡土墙，丁砌料石应深入中间毛石部分的长度不应小于200mm",{"key":28,"text":690,"correct":26},"毛石墙必须设置拉结石，拉结石应均匀分布，相互错开，一般每0.5㎡墙面至少设置一块，且同皮内的中距不大于2m",{"key":31,"text":692,"correct":22},"砌块砌体施工工艺流程为：基层处理→测量墙中线→弹墙边线→砌底部实心砖→立皮数杆→拉准线、铺灰、依准线砌筑→埋墙拉筋→梁下、墙顶斜砖砌筑",{"key":34,"text":694,"correct":26},"砌块砌体的埋墙拉筋应与钢筋混凝土柱（墙）的连接，采取在混凝土柱（墙）上打入2φ6@1000的膨胀螺栓","CE",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":224,"analysis":37},1160662,"建设工程价款动态结算的方法主要有（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":26},"按竣工调价系数结算",{"key":24,"text":703,"correct":26},"按实际价格结算",{"key":28,"text":705,"correct":22},"按预算价格结算",{"key":31,"text":707,"correct":26},"按调价文件结算",{"key":34,"text":709,"correct":26},"按调值公式结算",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":267,"analysis":37},1160663,"成本分析的方法是（ ）。",[714,716,718,720,722],{"key":20,"text":715,"correct":26},"比较法",{"key":24,"text":717,"correct":26},",因素分析法",{"key":28,"text":719,"correct":26},"差额计算法",{"key":31,"text":721,"correct":26},"比率法",{"key":34,"text":723,"correct":22},"偏差分析法",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":738,"analysis":37},1160664,"下列属于投资纠偏的管理措施的是（ ）。",[728,730,732,734,736],{"key":20,"text":729,"correct":26},"采用价值工程的方法",{"key":24,"text":731,"correct":22},"优化施工方法",{"key":28,"text":733,"correct":22},"制定节约投资的奖励措施",{"key":31,"text":735,"correct":22},"调整项目的组织结构",{"key":34,"text":737,"correct":26},"调整投资控制的方法和手段","AE",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]