[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161139":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1161139,821,3,"判断题","劳动定额一般采用工作时间消耗量来计算人工工日消耗的数量，所以其主要表现形式是产量定额。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"劳动定额一般采用工作时间消耗量来计算人工工日消耗的数量，所以其主要表现形式是时间定额，但同时也表现为产量定额。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)基础知识","建筑工程",0]