[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161129":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1161129,821,3,"判断题","工程量是以物理计量单位或自然计量单位表示的建筑工程的各分项工程或结构构件的实体数量。（ ）。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"工程量是以物理计量单位或自然计量单位表示的建筑工程的各分项工程或结构构件的实体数量。它是确定建筑安装工程费用，安排工程施工进度，编制材料供应计划和经济核算的重要依据。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)基础知识","建筑工程",0]