[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161128":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1161128,821,3,"判断题","分项工程的实际做法和工作内容必须与定额项目规定的达到80%及以上相符时才能直接套用。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"当设计要求与预算定额项目的内容完全一致时，可直接套用定额的工料机消耗量，因此，分项工程的实际做法和工作内容必须与定额项目规定的达到完全相符时才能直接套用。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)基础知识","建筑工程",0]