[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161046":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1161046,821,3,"判断题","工程项目质量管理通常采用PDCA循环方法。PDCA分为四个阶段，即计划P（Plan）、执行D（Do）、检查C（Check）和处置A（Action）阶段。（ ）。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"工程项目质量管理通常采用PDCA循环方法。PDCA分为四个阶段，即计划P（Plan）、执行D（Do）、检查C（Check）和处置A（Action）阶段。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)基础知识","建筑工程",0]