[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161029":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1161029,821,3,"判断题","土方回填压实的施工工艺流程：填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验，符合设计要求后，填筑上一层。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"土方回填压实的施工工艺流程：填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验，符合设计要求后，填筑上一层。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)基础知识","建筑工程",0]