[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160780":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1160780,821,2,"多选题","测定各种工程的工具费定额由企业材料管理部门负责，具体有（ ）三步。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","确定班组月定包工具费收人",false,{"key":16,"text":17,"correct":14},"B","基层材料部门根据工种班组标准定包工具的品种、规格、数量向有关班组发放",{"key":19,"text":20,"correct":21},"C","在向有关人员调查的基础上，查阅不少于2年的班组使用工具材料",true,{"key":23,"text":24,"correct":21},"D","分别确定各工种工具的使用年限和月摊销费",{"key":26,"text":27,"correct":21},"E","分别测定各工种的日工具费定额","CDE","测定各种工程的工具费定额由企业材料管理部门负责，具体有在向有关人员调查的基础上，查阅不少于2年的班组使用工具材料，分别确定各工种工具的使用年限和月摊销费，分别测定各工种的日工具费定额三步。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)基础知识","建筑工程",0]