[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160703":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1160703,821,2,"多选题","按工程进度编制施工成本计划，可以在进度计划的（ ）上按时间编制成本支出计划。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","横道图",true,{"key":16,"text":17,"correct":18},"B","单代号网络图",false,{"key":20,"text":21,"correct":18},"C","双代号网络图",{"key":23,"text":24,"correct":14},"D","时标网络图",{"key":26,"text":27,"correct":18},"E","搭接网络图","AD","按工程进度编制施工成本计划，可以在进度计划的横道图，时标网络图上按时间编制成本支出计划。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)基础知识","建筑工程",0]