[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160669":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1160669,821,2,"多选题","项目可行性研究直接影响项目的（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程勘察设计质量",false,{"key":16,"text":17,"correct":18},"B","决策质量",true,{"key":20,"text":21,"correct":18},"C","设计质量",{"key":23,"text":24,"correct":14},"D","工程施工质量",{"key":26,"text":27,"correct":14},"E","工程竣工验收质量","BC","设计阶段是影响工程项目质量的决定性环节;施工阶段是工程质量控制的关键环节。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)基础知识","建筑工程",0]