[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160330":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1160330,821,1,"单选题","材料管理是为顺利完成工程项目施工任务，合理（ ），努力降低材料成本所进行的材料计划、订货采购、运输、库存保管、供应、加工、使用、回收、再利用等一系列的组织和管理工作。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","使用和计划材料",false,{"key":16,"text":17,"correct":14},"B","计划和节约材料",{"key":19,"text":20,"correct":14},"C","使用和检测材料",{"key":22,"text":23,"correct":24},"D","使用和节约材料",true,"材料管理是为顺利完成工程项目施工任务，合理使用和节约材料，努力降低材料成本所进行的材料计划、订货采购、运输、库存保管、供应、加工、使用、回收、再利用等一系列的组织和管理工作。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]