[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160288":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1160288,821,1,"单选题","分部分项工程量清单的项目编码按《计价规范》规定，采用（ ）编码，其中第5、6位为（ ）顺序码。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","四级分部工程",false,{"key":16,"text":17,"correct":18},"B","五级分部工程",true,{"key":20,"text":21,"correct":14},"C","四级专业工程",{"key":23,"text":24,"correct":14},"D","五级附录分类","分部分项工程量清点的项目编码按《计价规范》规定，采用五级编码，其中第1、2位为专业工程代码，第3、4位为附录分类顺序码，第5、6为为分部工程顺序码。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]