[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160280":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1160280,821,1,"单选题","工程量清单项目编码按《建设工程工程量清单计价规范》（ ）B50500一2013）规定，第三、四位数字表示（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","附录分类顺序码",true,{"key":16,"text":17,"correct":18},"B","分部工程顺序码",false,{"key":20,"text":21,"correct":18},"C","专业工程代码",{"key":23,"text":24,"correct":18},"D","分项工程项目名称顺序码","工程量清单项目编码按《建设工程工程量清单计价规范》（B50500一2013）规定，第三、四位数字表示附录分类顺序码。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]