[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160270":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1160270,821,1,"单选题","下列哪一项不属于工程量计算的方法（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","按逆时针方向计算工程量",true,{"key":16,"text":17,"correct":18},"B","按先横后竖、先上后下、先左后右顺序计算工程量。",false,{"key":20,"text":21,"correct":18},"C","按轴线编号顺序计算工程量",{"key":23,"text":24,"correct":18},"D","按结构构件编号顺序计算工程量","选项中应该是按顺时针方向计算工程量。其他选项均属于工程量计算方法。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]