[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160173":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1160173,821,1,"单选题","工程项目管理的核心是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","合同管理",false,{"key":16,"text":17,"correct":18},"B","目标管理",true,{"key":20,"text":21,"correct":14},"C","质量管理",{"key":23,"text":24,"correct":14},"D","费用管理","工程项目管理的核心是目标管理。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]