[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160151":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1160151,821,1,"单选题","质量管理应由（ ）负责，并要求参加项目的全体员工参与并从事质量管理活动，才能有效地实现预期的方针和目标。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目经理",true,{"key":16,"text":17,"correct":18},"B","技术负责人",false,{"key":20,"text":21,"correct":18},"C","企业负责人",{"key":23,"text":24,"correct":18},"D","总工","质量管理应由项目经理负责，并要求参加项目的全体员工参与并从事质量管理活动，才能有效地实现预期的方针和目标。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]