[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160143":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1160143,821,1,"单选题","施工成本分析是在（ ）的基础上，对成本的形成过程和影响因素进行分析。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工成本计划",false,{"key":16,"text":17,"correct":14},"B","施工成本预测",{"key":19,"text":20,"correct":21},"C","施工成本核算",true,{"key":23,"text":24,"correct":14},"D","施工成本考核","施工成本分析是在施工成本核算的基础上，对成本的形成过程和影响因素进行分析。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]