[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160063":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1160063,821,1,"单选题","下列关于基坑（槽）开挖的说法错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","浅基坑（槽）开挖，应先进行测量定位，抄平放线，定出开挖长度",false,{"key":16,"text":17,"correct":14},"B","根据土质和水文情况．采取在四侧或两侧直立开挖或放坡，以保证施工操作安全",{"key":19,"text":20,"correct":14},"C","采用机械开挖基坑时，为避免破坏基底土，应在基底标高以上预留15~30cm的土层由人工挖掘修整",{"key":22,"text":23,"correct":24},"D","在地下水位以下挖土。应在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下200mm",true,"浅基坑（槽）开挖，应先进行测量定位，抄平放线，定出开挖长度。根据土质和水文情况．采取在四侧或两侧直立开挖或放坡，以保证施工操作安全。采用机械开挖基坑时，为避免破坏基底土，应在标高以上预留15～30cm的土层由人工挖掘修整。在地下水位以下挖土。应在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下500mm，以利于土方开挖。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]