[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160056":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1160056,821,1,"单选题","内墙饰面砖镶贴前应在水泥砂浆基层上弹线分格，弹出水平、垂直控制线。在同一墙面上的横、竖排列中，不宜有一行以上的非整砖，非整砖行应安排在次要部位或（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","阳角处",false,{"key":16,"text":17,"correct":14},"B","转弯处",{"key":19,"text":20,"correct":21},"C","阴角处",true,{"key":23,"text":24,"correct":14},"D","阳台下口","内墙饰面砖镶贴前应在水泥砂浆基层上弹线分格，弹出水平、垂直控制线。在同一墙面上的横、竖排列中，不宜有一行以上的非整砖，非整砖行应安排在次要部位或阴角处。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]