[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160055":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1160055,821,1,"单选题","某混凝土实验室配合比为1：2.3：4.4，水灰比为0.55，现场砂含水率为3％，石子的含水率为1％，则施工的配合比为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1：2.3：4.4",false,{"key":16,"text":17,"correct":14},"B","1：2.33：4.41",{"key":19,"text":20,"correct":14},"C","1：2.35：4.43",{"key":22,"text":23,"correct":24},"D","1：2.37：4.44",true,"水泥：砂：石：水=1：2.2：4.4：0.6=300：660：1320：180\\n因为实测现场砂含水量4%，石含水量2%\\n 所以 300：660+660*4%：1320+1320*2%：180-660*4%-1320*2% =300：686：1346：128\\n施工配合比水泥：砂：石：水=300KG：686KG：1346KG：128KG=1:2.37:4.44",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]