[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1160034":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1160034,821,1,"单选题","预制桩的强度应达到设计强度标准值的（ ）后方可运输。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","25％",false,{"key":16,"text":17,"correct":14},"B","50％",{"key":19,"text":20,"correct":14},"C","75％",{"key":22,"text":23,"correct":24},"D","100％",true,"预制桩应在浇筑的混凝土达到设计强度的75％后方可起吊，达到设计强度的100％后方可运输。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]